Unlock instant, AI-driven research and patent intelligence for your innovation.

Function pre-test method and system for data communication gateway machine

A data communication network and gateway technology, applied in the field of smart grid, can solve problems such as fault point location

Active Publication Date: 2021-04-09
STATE GRID ZHEJIANG ELECTRIC POWER CO LTD QUZHOU POWER SUPPLY CO +2
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The invention mainly solves the problem that the fault point cannot be remotely located when the remote control of the EMS main station fails, and the staff needs to go to the scene to check. After the remote control operation fails, it is a function pre-test method of the data communication gateway machine to assist in detecting whether the remote control failure is caused by the abnormality of the gateway machine to the measurement and control device itself

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Function pre-test method and system for data communication gateway machine
  • Function pre-test method and system for data communication gateway machine

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0025] In this embodiment, a data communication gateway machine function pre-test system, such as figure 1 As shown, including gateway machine 1, EMS master station 2, measurement and control device 3, operation and maintenance master station 4 and operation and maintenance substation 5, the gateway machine communicates with the EMS master station through IEC104, communicates with the measurement and control device through IEC61850MMS, and accepts the EMS master station The issued remote control command is sent to the measurement and control device, and then the slave device returns the result to the master station. The operation and maintenance master station is deployed at the main station of the operation and maintenance management and control system, and the operation and maintenance sub-station is deployed at the substation end. The operation and maintenance master station and the operation and maintenance sub-station communicate through GSP; There are IEC104 channel and ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a function pre-test method and system for a data communication gateway machine. The method comprises the following steps: initiating a remote control pre-test command; enabling the operation and maintenance substation to receive the remote control pretest command, and if the command can be executed, forwarding the command to the gateway machine; otherwise, sending a function pretest failure alarm to the operation and maintenance master station and recording a preset serialization report; enabling the gateway machine to receive the remote control pre-test command, and if the gateway machine is not abnormal, forwarding the remote control pre-test command to the measurement and control device; otherwise, enabling the gateway machine to send a remote control command failure state message to the operation and maintenance substation; enabling the measurement and control device to receive the remote control pre-test command, and if the measurement and control device is not abnormal, returning a remote control command anti-correction message; and otherwise, enabling the measurement and control device to send a state message that the remote control command fails to work to the gateway machine. The system comprises a gateway machine, an EMS main station, a measurement and control device, an operation and maintenance main station and an operation and maintenance substation. The method and the system have the advantages that: the remote control function test is realized on the premise of not changing the working state of the measurement and control device; and it is verified whether remote control in the station has a problem or not, and assisting in detecting remote control failure reasons.

Description

technical field [0001] The invention relates to the field of smart grids, in particular to a function pretest method and system for a data communication gateway. Background technique [0002] At present, the data communication gateway machine is connected to the EMS master station through the dispatching data network through the IEC104 communication protocol, transmits the data to the EMS master station, and accepts the remote control information issued by the EMS master station. Due to the complex link between the EMS master station and the gateway, when the remote control of the EMS master station fails, it is impossible to clearly know whether there is a problem between the gateway in the station and the measurement and control device, causing the remote control to fail, or the communication link. A failure caused by a problem. In addition, if the failure is caused by reasons within the station, since 104 cannot transmit the specific reason for the failure, the master st...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H04L12/26H02J13/00
CPCH04L43/50H04L43/08H02J13/00028Y04S10/16Y02E60/00
Inventor 杜奇伟郑翔阮黎翔孙珂刘永新刘栋方超侯雅林张文准车帅铁勇魁张庭卫星
Owner STATE GRID ZHEJIANG ELECTRIC POWER CO LTD QUZHOU POWER SUPPLY CO