A technology of adaptive control and high-speed railway foundation, which is applied in the direction of adaptive control, general control system, control/regulation system, etc. It can solve the problems that the subgrade deformation cannot be adjusted in real time, and achieve the effect of improving ride comfort and stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Such as Figure 1 to Figure 5 As shown, the embodiment of the present invention proposes a high-speed railway foundation deformation adaptive control system, which includes: a number of base displacement sensors 9, a hole reamer 1, a liquid storage tank 7 and a controller 6, wherein the base displacement sensor 9 and the reamer 1 are buried under the subgrade, and the base displacement sensor 9 is arranged above the reamer 1. The reamer 1 is composed of several adjacent and independent chambers 10, and the two ends of the chamber 10 are respectively The liquid input pipe 2 and the liquid output pipe 8 are connected, and the liquid input pipe 2 and the liquid output pipe 8 are respectively connected to the liquid storage tank 7 to form an input-output circuit. At the same time, an input valve is provided between the chamber 10 and the liquid input pipe 2 31, an output valve 32 is provided between the chamber 10 and the liquid output pipe 8, the controller 6 is arranged i...
Embodiment 2
[0045] Figure 6 The implementation flowchart of the high-speed railway subgrade deformation adaptive control method provided by the second embodiment of the present invention, for the convenience of explanation, only shows the part related to the embodiment of the present invention, and is described in detail as follows:
[0046] Step S21, obtaining the base displacement value collected by the base displacement sensor in real time, and calculating the settlement value according to the base displacement value.
[0047] In the embodiment of the present invention, during the service process of the roadbed, the base displacement sensor collects the deformation on the roadbed in real time, the controller acquires the base displacement value collected by the base displacement sensor in real time, and calculates the settlement value according to the bottom displacement value, and the controller analyzes the deformation of each place on the roadbed Settlement value, and evaluate the ...
Embodiment 3
[0064] Figure 7 The implementation flowchart of the high-speed railway subgrade deformation adaptive control method provided by Embodiment 3 of the present invention, for the convenience of description, only shows the parts related to the embodiment of the present invention, and is described in detail as follows:
[0065] Step S31, obtaining the base displacement value collected by the base displacement sensor in real time, and calculating the settlement value according to the base displacement value.
[0066] In the embodiment of the present invention, during the roadbed service process, a large number of base displacement sensors are installed on the base of the high-speed rail, and the base displacement sensors collect the deformation on the roadbed in real time, and the controller obtains the base displacement value collected by the base displacement sensor in real time, and calculates according to the base displacement value Settlement value, the controller analyzes the ...