Assembled temporary guardrail for reconstructed, expanded, elevated and widened bridge
A prefabricated and temporary technology, applied in the direction of bridges, buildings, bridge parts, etc., can solve the problems affecting the construction progress, the traffic level of the expressway, and the traffic volume exceeding, so as to improve the construction efficiency, facilitate the installation and dismantling, and improve the economy. benefit effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be clearly and completely described below in conjunction with the accompanying drawings, so that those skilled in the art can fully implement the present invention without creative work.
[0026] The specific embodiment of the present invention is: as Figure 1-7 As shown, an assembled temporary guardrail for the reconstruction and expansion of the raised and widened bridge includes pre-embedded anchors 1, assembled columns 3, cross-connection pipes 4, anti-collision protection tubes 5, bridge deck cast-in-place formwork 2, and fixing bolts I6 , fixing bolt II7, fixing bolt III8, fixing bolt IV9, the embedded anchor 1 is fixed on the beam top flange, the bottom of the assembled column 3 and the embedded anchor 1 are fixedly connected by fixing bolt III8, and the cross-link The pipe 4 is arranged between two adjacent assembled columns 3 and fixed by fixing bolts IV9. The anti-collision casing 5 is arranged in the middle of the side of the assem...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


