Bottom tower with pre-installed bottom platform and installation method thereof
A pre-installation, tower technology, applied in the installation/support of wind turbine configuration, wind turbine, climate sustainability, etc. Improves firmness and stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] A bottom tower with a pre-installed bottom platform, such as Figure 1 to Figure 7 shown, including:
[0045] The tower main body 1 is installed on the tower foundation, and the tower main body is provided with a first connecting piece 11 and a second connecting piece 12;
[0046] The bottom platform 2 is fixed in the main body of the tower in a pre-installed manner. The height of the bottom platform matches the position of the tower door 13 of the main body of the tower. The bottom platform includes a support frame 21 and a platform panel 22. The platform The panel is fixedly mounted on the support frame, the support frame is fixedly connected to the tower body through a first connecting piece, and the platform panel is fixedly connected to the tower body through a second connecting piece;
[0047]The upper platform 4 includes an upper platform frame 40 assembled by a plurality of first support beams 41 and a plurality of second support beams 42, the upper platform fr...
Embodiment 2
[0057] An installation method of a bottom tower, applicable to the bottom tower described in any one of the above-mentioned embodiment 1 and its preferred solution, the method includes:
[0058] Step 1: Obtain the tower body of the bottom tower;
[0059] Step 2: fixing the end of the support frame to the first connector on the inner wall of the tower main body in the tower main body;
[0060] Step 3: Fix and install the platform panels on the support frame in sequence;
[0061] Step 4: The platform panel is fixedly connected to the second connector on the inner wall of the tower main body to complete the pre-installation of the bottom platform;
[0062] Step 5: Fix the upper platform frame on the top of the main body of the tower;
[0063] Step 6: hoist the bottom tower with pre-installed bottom platform and upper platform, and install the bottom tower on the tower foundation;
[0064] Step 7: Build the support frame of the bottom platform under the bottom platform;
[006...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com