Multi-project joint management method and system based on project cost
A project cost, multi-project technology, applied in the field of project management, can solve the problems of insufficient cooperation between departments, inaccurate project progress, low project management efficiency, etc., to achieve the effect of improving joint management efficiency, enhancing cooperation ability, and accurately tracking progress.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Such as figure 1 As shown, the embodiment of the present application provides a multi-project joint management method based on engineering cost, wherein the method includes:
[0034] Step S100: Obtain the first project cost information of the first project, wherein the project cost information comes from the first configuration team, and the first project is a joint management project;
[0035] Such as image 3 As shown, further speaking, wherein said obtaining the first project cost information of the first project, the step S100 of the embodiment of the present application further includes:
[0036] Step S110: According to the plan of the first project, calculate the engineering quantity of the first project to obtain the engineering quantity of the first project;
[0037] Step S120: Obtain the first construction plan of the first configuration team according to the engineering quantity of the first project;
[0038] Step S130: input the engineering quantity of the...
Embodiment 2
[0091] Based on the same inventive idea as the multi-project joint management method based on engineering cost in the foregoing embodiments, the present invention also provides a multi-project joint management system based on engineering cost, such as Figure 8 As shown, the system includes:
[0092] A first obtaining unit 11, the first obtaining unit 11 is configured to obtain first project cost information of a first project, wherein the project cost information comes from a first configuration team, and the first project is a joint management project;
[0093] A second obtaining unit 12, the second obtaining unit 12 is used to obtain the construction efficiency coefficient of the first configuration team;
[0094] A third obtaining unit 13, the third obtaining unit 13 is configured to obtain the construction of the first project in the configuration team according to the construction efficiency coefficient of the first configuration team and the process node data of the fir...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com