Corridor suspended ceiling mounting plate hoisting structure and construction method thereof

A construction method and a technology for installing panels, which are applied in lifting devices, building structures, buildings, etc., can solve problems such as difficulty in construction and installation, and achieve the effects of reduced installation difficulty, high safety factor, and safe use

Inactive Publication Date: 2021-09-24
深圳粤源建设有限责任公司
View PDF7 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Based on this, the purpose of the present invention is to provide a hoisting structure and construction method for the installation board of the corridor ceiling, so as to solve the problem that in the prior art, most of the corridor ceilings are far away from the bottom surface, and they are often located at high altitudes, causing construction and installation problems. Difficult technical issues

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Corridor suspended ceiling mounting plate hoisting structure and construction method thereof
  • Corridor suspended ceiling mounting plate hoisting structure and construction method thereof
  • Corridor suspended ceiling mounting plate hoisting structure and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the drawings in the embodiments of the present invention. The embodiments described below by referring to the figures are exemplary only for explaining the present invention and should not be construed as limiting the present invention.

[0040] The embodiments of the present invention will be described below according to the overall structure of the present invention.

[0041] A hoisting structure for a ceiling installation plate in a corridor, such as figure 1 , figure 2 and image 3 As shown, it includes the first tower 1 and the second tower 2 and the corridor 3 connected in the middle, the top ends of the corridor 3 are provided with supporting steel beams 4, and the tops of the two sets of supporting steel beams 4 are respectively provided with two groups of winches 5 ;

[0042] There is a steel truss 7 on one side of the bo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a corridor suspended ceiling mounting plate hoisting structure and a construction method thereof, and relates to the technical field of building construction. The corridor suspended ceiling mounting plate hoisting structure comprises a first tower, a second tower and a corridor connected between the first tower and the second tower, supporting steel beams are arranged at the two ends of the top of the corridor correspondingly, and two winches are arranged at the tops of the two supporting steel beams correspondingly. A steel truss is arranged on one side of the bottom of the corridor, the four sets of winches are connected with the four corners of the steel truss through lifting steel wire ropes, and cable-stayed steel wire rope mechanisms connected with the steel truss are obliquely arranged at the four corners of the bottom of a bottom steel structure beam. According to the corridor suspended ceiling mounting plate hoisting structure and the construction method thereof, the steel truss is hoisted through the multiple sets of winches, then an aluminum plate needing to be installed is placed on the top of the steel truss to be hoisted, the bottom of the whole corridor is divided into four construction stages, the positions for hoisting the aluminum plate are replaced through transverse movement of the winches, the overall high-altitude aluminum plate installation difficulty is greatly reduced, installation is convenient, and the safety coefficient is high.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a hoisting structure of a corridor ceiling installation plate and a construction method thereof. Background technique [0002] Corridor was originally a form of ancient Chinese architecture, that is, a connecting structure between buildings, with a roof and no enclosure structure. On the one hand, the setting of the corridor is due to the functional requirements of the building. At the same time, the conjoined body has good lighting effects and a wide view, so it can be used as a sightseeing corridor or a leisure coffee shop. On the other hand, due to the setting of the corridor, the appearance of the building can be more distinctive and can Create a more harmonious architectural atmosphere, in addition, there is a fire corridor, which acts as a safe passage. [0003] In the prior art, most of the corridor ceilings are far away from the bottom surface, and are ofte...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B66F11/00E04G21/16E04G21/32
CPCB66F11/00E04G21/16E04G21/32E04G21/3204
Inventor 陈忠衡