Unlock instant, AI-driven research and patent intelligence for your innovation.

Intelligent robot for electric power overhaul

An intelligent robot and power maintenance technology, applied in the direction of instruments, electrical components, only measuring voltage, etc., can solve the problems of maintenance work that cannot be performed through its equipment, waste of time, and large labor, so as to improve maintenance efficiency and save time. , the effect of efficient maintenance

Active Publication Date: 2021-09-24
XINGHUA JIAHUI ELECTRICAL EQUIP LTD
View PDF12 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] For electric power and grid circuit inspection work, it is a boring and repetitive and tedious task for electric power workers. When manually maintaining and repairing, it is often necessary to inspect along the circuit, so the workload is large and time-consuming
In order to solve this problem, an intelligent robot for electric power maintenance was invented. The application number CN108170734A announced an intelligent operation and maintenance robot. This invention completes the maintenance of electric power signals and networks through interactive analysis and information retrieval. Compared with the device of this invention, it can detect power failures and transmit the faulty electrical signals to the pan / tilt, cooperate with the database or cloud platform to re-match or set electrical signals, and realize the intelligent maintenance function. And tighten the loose power lines while running

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent robot for electric power overhaul
  • Intelligent robot for electric power overhaul
  • Intelligent robot for electric power overhaul

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0022] Example: such as figure 1 , figure 2 , image 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 and Figure 8 A kind of electric maintenance intelligent robot shown, comprises tension mechanism 1, fastening mechanism 2, detection mechanism 3.

[0023] Such as figure 2 , 3 In the tensioning mechanism 1 shown, the roller 101 is fixedly mounted on the rotating shaft 102, the rotating shaft 102 is mounted on the chassis 103 in rotation, the support frame 104 is fixedly mounted on the chassis 103, the fixed plate 105 is fixedly mounted on the support frame 104, two vertical The straight air cylinder 106 is connected together by the connecting rod 108 and is fixedly installed on the fixed plate 105, and the two adjusting cylinders 109 are connected together by the connecting rod 108 and slidably installed on the groove of the fixed plate 105, and the fixed rod 110 is fixedly installed on the adjustable On the cylinder 109, one of the two intermediate shafts 110 is ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the field of electric power overhaul instruments, in particular to an intelligent robot for electric power overhaul. The intelligent robot for electric power overhaul comprises a tensioning mechanism, a fastening mechanism and a detection mechanism. The tensioning mechanism is a mounting seat of the whole device, the fastening mechanism is fixedly mounted on a chassis of the storage mechanism, and the detection mechanism is fixedly mounted on the chassis of the storage mechanism. Compared with the prior art, the intelligent robot has the beneficial effects that the intelligent power maintenance work of the whole line is completed through the detection mechanism, the power maintenance time is saved, and the maintenance efficiency is improved; while normal power supply is guaranteed, laying of a cable power grid along the line is comprehensively fastened and installed, and dangerous accidents are avoided; the stability or abnormal condition of the voltage signal is detected, the detection result is visually presented by using the electromagnetic adsorption principle, the electric signal is re-matched or set in cooperation with a database or a cloud platform, and the intelligent maintenance function is achieved.

Description

technical field [0001] The invention relates to the field of electric power maintenance equipment, in particular to an electric power maintenance intelligent robot. Background technique [0002] For electric power and power grid circuit inspection work, it is a boring and repetitive and cumbersome task for electric power workers. When manually maintaining and repairing, it is often necessary to inspect along the circuit, so the workload is large and time-consuming . In order to solve this problem, an intelligent robot for electric power maintenance was invented. The application number CN108170734A announced an intelligent operation and maintenance robot. This invention completes the maintenance of electric power signals and networks through interactive analysis and information retrieval. Compared with the device of this invention, it can detect power failures and transmit the faulty electrical signals to the pan / tilt, cooperate with the database or cloud platform to re-matc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H02G1/00H02G1/02H02G1/04H02J13/00G01R19/00
CPCH02G1/00H02G1/04H02G1/02H02J13/00032H02J13/00002H02J13/00001G01R19/0084
Inventor 顾加辉韩晓峰卢江红
Owner XINGHUA JIAHUI ELECTRICAL EQUIP LTD