Forming reinforcing steel bar for prefabricated concrete column or prefabricated concrete beam and production method thereof
A technology for concrete beams and concrete columns, applied in the field of forming steel bars, can solve the problems of high labor cost, high cost, hindering the development of concrete prefabricated buildings, etc., and achieve the effect of reducing production cost and improving production efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0062] This embodiment discloses a shaped steel bar for concrete column prefabricated parts or concrete beam prefabricated parts, refer to Figure 1~2 . It includes longitudinal reinforcement 1 and spiral reinforcement 2 embedded in the main body of the concrete column prefabricated part or the concrete beam prefabricated part.
[0063] Longitudinal steel bar 1, its setting direction is parallel to the length direction of the main body of the concrete column prefabricated part or the concrete beam prefabricated part;
[0064] The spiral bars 2 are spirally arranged around the outer side of the longitudinal steel bar 1 according to preset intervals, and are used to hoop the whole of the longitudinal steel bar 1;
[0065] It should be noted that the spiral reinforcement 2 can be one or a combination of steel bars, steel strands, flat steel, thin steel plates, and carbon fibers. The present embodiment spiral bar 2 adopts steel bar.
[0066] The position of the intersection of ...
Embodiment 2
[0069] This embodiment discloses a shaped steel bar for a concrete column prefabricated part or a concrete beam prefabricated part whose cross section is "L" or "T" or "ten". Figure 3-5 .
[0070] Its longitudinal steel bars 1 include a first group of longitudinal steel bars 11 and a second group of longitudinal steel bars 12; its spiral bars 2 include a first group of spiral bars 21 and a second group of spiral bars 22;
[0071] The first group of spiral bars 21 are arranged spirally around the outside of the first group of longitudinal reinforcement bars 11, and are used to hoop the whole of the first group of longitudinal reinforcement bars 11; To hoop the whole of the second group of longitudinal steel bars 12.
[0072] In the formed steel bar of this embodiment, the longitudinal steel bar 1 also includes the zeroth group of longitudinal steel bars 10, and the zeroth group of longitudinal steel bars 10 is hooped by the first group of spiral bars 21 and the second group o...
Embodiment 3
[0077] This embodiment discloses a prefabricated concrete column or concrete beam prefabricated steel bar with a "cage within a cage" situation. Refer to Figure 6~7 .
[0078] Its shaped reinforcement includes inner reinforcement cage A n (the completed reinforcement cage, as the inner reinforcement cage), the third group of longitudinal reinforcement 13 and the third group of spiral reinforcement 23;
[0079] The third group of longitudinal reinforcement 13 is located in the inner reinforcement cage A n outside, the third group of spiral bars 23 surrounds the third group of longitudinal steel bars 13 and the inner reinforcement cage A n The outer helical setting is used to hoop the third group of longitudinal reinforcement 13 and the inner reinforcement cage A n Overall.
[0080] The position of the intersection of longitudinal reinforcement 1 and spiral reinforcement 2 is connected by spot welding.
[0081] It should be noted that no matter whether it is a longitudinal...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com