Construction method of water well penetrating through underground cave
A construction method and underground cave technology, which is applied in the direction of earth drilling, filling, safety devices, etc., can solve the problems of elongated construction period, filling materials and labor waste, and achieve reduced consumption, good position limiting effect, and reduced cost Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0024] see Figure 1 to Figure 6A construction method for a water well passing through an underground cave is carried out through, but not limited to, a limiting device for partially filling the underground cave, and the limiting device for partially filling the underground cave includes a recycling frame and a limiting fence. The recycling rack comprises an upper circular frame 1, a lower circular frame 2 and several vertical air pipes 3 distributed along the circumferential direction...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


