Underground cave local filling method
A filling method and technology of underground caves, which are applied in the fields of soil protection, construction, and infrastructure engineering, etc., can solve the problems of elongated construction period, uncontrollable, unprotected effect, etc., so as to reduce the construction period and density degree, the effect of reducing construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0023] see Figure 1 to Figure 5, a method for partially filling an underground cave, which is carried out by, but not limited to, a limiting device for partially filling an underground cave. The limiting device for partially filling an underground cave includes a recycling frame and a limiting fence. The recycling rack comprises an upper circular frame 1, a lower circular frame 2 and several vertical air pipes 3 distributed along the circumferential direction of the upper circular fra...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


