Stope point column supporting, reinforcing and recovering method
A recycling method and point post technology, applied in ground mining, mining equipment, earth-moving drilling, etc., can solve the problems of difficult recycling, low efficiency, and difficult to guarantee operation safety, so as to ensure the safety and improve the strength of the point post. , the effect of security
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] The technical scheme of the present invention is described in detail below in conjunction with accompanying drawing:
[0041] Such as figure 1 , a stope point column support reinforcement and recovery method is based on the long anchor cable 1 to pre-reinforce the stope point column 6 before the stope ore body is recovered, and at the same time use the long anchor cable 1 to drill holes 12 and guide shafts 8 Recovering the point column 6 effectively ensures that the integrity of the point column 6 is not damaged during stope construction. In addition, it further ensures that the point column 6 can safely support the stope roof during stope recovery to ensure the safety of mining, and at the same time simplifies the point column 6. The recovery method ensures the safety of the point column 6 recovery operation and effectively reduces the dilution of the ore 17 recovered by the point column 6.
[0042] The core idea of this method is:
[0043] 1. Mining support stage....
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com