[0003] Insufficient 1. Due to the long erection period of the bracket, the progress of the project is affected;
[0004] Insufficient 2. Increased construction cost;
[0005] Less than 3. Slow construction efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated assembly type construction method for inter-pier collar beams of highway bridges of various grades
  • Prefabricated assembly type construction method for inter-pier collar beams of highway bridges of various grades
  • Prefabricated assembly type construction method for inter-pier collar beams of highway bridges of various grades

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The present invention will be described in detail below in conjunction with the accompanying drawings, and the technical solutions in the embodiments of the invention will be clearly and completely described. Apparently, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0031] A prefabricated construction method for tie beams between piers of highway bridges of various grades, comprising the following steps:

[0032] Step ①; prefabricated prefabricated tie beam (1);

[0033] Step ②: leveling the construction area of ​​the tie beam between piers;

[0034] Step 3.; Bottom tie beam (6) construction;

[0035] Step ④; the first section of pier column construction;

[0036] Step ⑤: Gouging and cleaning the top of the pier form...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a prefabricated assembly type construction method for inter-pier collar beams of highway bridges of various grades. The method comprises the steps of step 1, prefabricating a collar beam (1); step 2, conducting field leveling on an inter-pier collar beam construction area; step 3, constructing a bottom collar beam (6); step 4, constructing a first section of pier column; step 5, chiseling and cleaning the top of an upper section pier column template (4); step 6, measuring and setting out the position of the prefabricated collar beam (1); step (7), prefabricating the prefabricated collar beam (1); step 8, arranging hanging rings (7); step 9, transporting and hoisting the prefabricated collar beam (1); step (10), binding remaining steel bars of the first section of pier column; step (11), mounting the rest templates of the first section of pier column; step (12), pouring and maintaining remaining concrete of the first section of pier column; step (13), removing the upper section pier column template (4); and step (14), performing concrete construction on the second-section pier column and the third-section pier column. The method has the advantages that the safety risk of high-place operation of workers is reduced, the construction period is shortened, and the construction cost is reduced.

Description

technical field [0001] The invention relates to the field of highway bridge construction, in particular to a prefabricated construction method for tie beams between piers of highway bridges of various grades. Background technique [0002] In recent years, with the continuous construction of various grades of highways, highway bridges have also been widely used. At present, the cast-in-place method is usually used in the construction of the tie beams between the piers of highway bridges. After the concrete construction of the pier columns in the upper section is completed, the hoop method or the piercing rod method is used to support the concrete pouring platform of the pier column tie beams, and then support the formwork, Binding steel bars, pouring pier tie beam concrete. This method has the following disadvantages: [0003] Insufficient 1. Due to the long erection period of the bracket, the progress of the project is affected; [0004] Insufficient 2. Increased construc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D19/02E01D101/26
CPCE01D21/00E01D19/02E01D2101/26
Inventor 赵尚哲张连生冯宝成方立志肖峰
Owner CCCC FIRST HARBOR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products