Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

High-pier cast-in-place beam support and construction method thereof

A construction method and technology of cast-in-place beams, which are applied to bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as heavy workload, poor economic and social benefits, and long construction period, so as to achieve short construction period and save The effect of high construction time and high construction safety factor

Active Publication Date: 2022-02-25
THE FIFTH ENG CO LTD OF CHINA TIESIJU CIVIL ENG GRP +1
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The cast-in-place beam support is usually cast-in-situ with the buckle-type steel pipe support or the steel pipe column frame method. For cast-in-place beams with high pier heights and limited terrain conditions, if the common steel pipe Buckle-type steel pipe support method construction not only has a huge workload and a long construction period, but also has poor economic and social benefits

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-pier cast-in-place beam support and construction method thereof
  • High-pier cast-in-place beam support and construction method thereof
  • High-pier cast-in-place beam support and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0030] see Figure 1-4 , the construction method step of the present invention is specifically as follows:

[0031] S1: Before the pier body 1 is poured, notches 11 must be reserved in advance for the upper and lower ends of the pier body 1, and the notches 11 must be constructed accurately. Before the pier body 1 is poured, it is necessary to reinforce the notch 11, especially to ensure that the base end of the corbel and the concrete at the notch 11 end of ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a high-pier cast-in-place beam support and a construction method thereof. The construction method comprises the following steps that first shear keys used for supporting a lower tie beam are pre-buried at the lower ends of the opposite sides of adjacent pier bodies, and second shear keys used for supporting an upper cross beam are pre-buried at the upper ends of the opposite sides of the adjacent pier bodies; the lower tie beam is erected on the first shear keys; the upper cross beam is erected on the second shear keys; a supporting rod system used for connecting the upper cross beam and the lower tie beam is hoisted; a plurality of sand boxes are mounted on the top surface of the upper cross beam; a distribution main cross beam is installed on the top faces of the sand boxes, and a pre-assembled bailey beam is hoisted and erected on the distribution main cross beam; and a transverse distribution beam is installed on the top face of the bailey beam, and then support erecting is completed. According to the method, under different pier height conditions, the shear keys are pre-buried in the pier bodies, the shear keys serve as stress points to conduct support erecting, the method is mainly suitable for the wading working condition, the first shear keys are pre-buried at the lower ends of the pier bodies, the lower tie beam is erected on the first shear keys, and the height of the lower tie beam can be determined during design according to topographic conditions.

Description

technical field [0001] The invention relates to a bridge support construction method, in particular to a high pier cast-in-place beam support and a construction method thereof. Background technique [0002] With the continuous deepening and improvement of the high-speed railway construction network, a large number of new lines pass through bridges and mountains. Through the design of cast-in-place beam support types, the demand for high safety, good efficiency and short construction period for support cast-in-place beam construction is becoming more and more urgent. . The cast-in-place beam support is usually cast-in-situ with the buckle-type steel pipe support or the steel pipe column frame method. For cast-in-place beams with high pier heights and limited terrain conditions, if the common steel pipe The buckle-type steel pipe support method construction not only has a huge workload and a long construction period, but also has poor economic and social benefits. Contents ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 乔福鑫张晓强阚剑锋周廷
Owner THE FIFTH ENG CO LTD OF CHINA TIESIJU CIVIL ENG GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products