Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

340results about How to "Reduce construction intensity" patented technology

Unsteamed concrete air-filled insulating brick produced from building waste, and production method thereof

The invention relates to an unsteamed concrete air-filled insulating brick produced from building waste, and a production method of the insulating brick. The insulating brick is prepared from the raw materials in parts by weight: 30-40 parts of cement, 20-30 parts of aggregate, 8-10 parts of CaO, 3-5 parts of CaSO4, 3-5 parts of carbamide, 3-5 parts of polyvinyl alcohol, 5-10 parts of cellulose hydroxypropyl methyl, 3-5 parts of calcium formate, 5-10 parts of foaming agent and 40-60 parts of external water, wherein cement contains one or more than two of common silicate, high-alumina cement, fly ash cement, alumina cement and aluminate cement; the aggregate is building waste with the particle size being less than or equal to 5mm; and the foaming agent contains one or more than two of aluminium powder, aluminium powder paste, hydrogen peroxide and sodium hydrogen carbonate. The unsteamedconcrete insulating brick is prepared by material preparing, mixing, injection molding and curing. Therefore, the land occupation and the living environmental pollution caused by the building waste can be effectively reduced, and the produced unsteamed concrete air-filled insulating brick has the advantages of good heat insulation effect, light weight, good sound insulation effect and high strength, and can be nailed and sawed; and the construction intensity can be reduced.
Owner:ANSHAN QUANYIJU ENVIRONMENTAL PROTECTION BUILDINGMATERIAL

Construction material produced by utilizing industrial residue

The invention discloses a construction material produced from industrial residue, aims to provide a construction material having the advantages of light weight, sound insulation, heat insulation, low cost, fire resistance, dense products, high rigidity and the like, and solves the problems with land occupation and pollute environment of phosphate slag and phosphogypsum at the same time. the invention is realized through the following technical scheme: phosphate slag and phosphogypsum are used as raw materials for producing the construction material, which comprises the following components by the weight part: 35 to 65 parts of phosphate slag, 10 to 40 parts of phosphogypsum, 5 to 15 parts of lime, 15 to 28 parts of cement, 0.1 to 0.4 part of light aggregate, 0.02 to 0.05 part of soluble glass, 0.02 to 0.05 part of water-reducing agent, 0 to 0.004 part of retarding agent, 0 to 0.005 part of early-strength admixture, and 0 to 0.008 part of foam killer; the components are weighed by the formula weight part and added to a blender; water is added to the blender with the water-to-material proportion being 4 to 10 and mixed evenly with the materials; and the solution is cast into a die and natural air dried after molding. Dies with different structures can be used according to purposes to conduct cast molding. The construction materials such as wall plates, guardrail decoration pillars, door and window sleeves, vase sleeves and the like can be produced.
Owner:张勇飞

Modularized box type charging and battery swapping station

The invention provides a modularized box type charging and battery swapping station used for replacing a battery of an electric car. The charging and battery swapping station comprises a central monitoring room 1, a battery swapping robot 2 and a charging and battery swapping box 3, wherein the central monitoring room 1 is used for monitoring the charging and battery swapping station, the battery swapping robot 2 is located between the charging and battery swapping circuit 3 and the electric cars provided with batteries to be replaced, and the battery between the electric cars provided with batteries to be replaced can be replaced; and a battery storage rack 301, a battery charger cabinet 302, a monitoring cabinet 303, a distribution cabinet 304, a temperature control system 305 and an access path 306 are arranged in the charging and battery swapping box 3. The modularized box type charging and battery swapping station, provided by the invention, has the advantages of strong adaptability, flexible configuration and expansibility, small floor space, high working efficiency, short construction period, benefit for large-scale popularization and construction, high automation degree, smaller device maintenance amount, simple structure and low fault rate.
Owner:BEIJING STATE GRID PURUI EXTRA HIGH VOLTAGE POWER TRANSMISSION TECH CO LTD +1

Construction method of soil covering tank

The invention relates to a construction method of a soil covering tank for storing product oil and the like, which comprises the following steps of: (A) building a tank chamber of a soil covering tank: firstly, carrying out earth excavation with a method combining a back-acting shovel and manual excavation; then, manufacturing a ring beam, precasting concrete blocks on the spot according to the radian of the ring beam, and building the concrete blocks; carrying out the engineering of steel bars: welding steel bars by machining, and manually binding the steel bars on the spot; carrying out the engineering of templates and scaffolds: taking a bamboo plywood as a top plate template of a concrete thin shell of the tank chamber, designing a camber at the middle part, and taking scaffold tubes as bottom template brackets of the thin shell of the tank; then, carrying out concrete engineering and asphalt sand construction; and finally, carrying out waterproof engineering, thereby completing the construction of the tank chamber of the soil covering tank; and (B) installing a storage tank body of the soil covering tank: firstly, precasting the storage tank body; then, installing a tank bottom plate; installing the tank body, and welding the storage tank; and finally, testing and inspecting to complete the whole construction process of the soil covering tank after the construction is qualified. The invention reduces the occurrence of accidents, increases the benefit and reduces the dust emission.
Owner:中国化学工程第四建设有限公司

Local repair system and method of drainage pipeline

ActiveCN109868882AHigh sensitivity curing efficiencyPrecise positioningSewer pipelinesAir volumeControl system
The invention provides a local repair system and method for a drainage pipeline. a system on the ground comprises a control system, a driving system, a draught fan and a generator set providing a power source for the system on the ground and a downhole system; the downhole system includes a CCTV pipeline inspection robot and a light-curing repairing device; the driving system drives the light-curing repairing device to move inside the pipeline and detect and diagnose the inner part of the pipeline; after breakage points are detected inside the pipeline, a signal is sent to the control system;and after the driving system drives the light-curing repairing device to move to the breakage points, the draught fan conveys the air volume to the light-curing repairing device, and the light-curingrepairing device starts ultraviolet lamps to repair the breakage points inside the pipeline in sequence. In the construction process, a trenchless mode is adopted, the automation degree is high, the strength is low, and the efficiency is high; construction on the ground occupies small space, and the safety is high; no noise and no disturbance to residents exist; the curing efficiency is high; thecuring process is controllable, and can be monitored in real time; the repairing is accurate; and the repairing operation with water is realized through the combination of normal temperature points and ultraviolet ray curing repairing.
Owner:北京普洛兰管道科技有限公司

Box-building type optical fiber splicing unit capable of being repeatedly opened and used

The invention discloses a box-building type optical fiber splicing unit capable of being repeatedly opened and used, comprising a front-mounted box assembly used for fixing an optical fiber and a rear-mounted box assembly used for fixing the optical cable coating of the optical fiber, wherein and the front-mounted box assembly and the rear-mounted box assembly are fixedly connected; the front-mounted box assembly comprises a shell, a building cover, a front-mounted box, a V-slot metal block, a lock pin and a guide block, and the building cover is arranged on the shell; the front-mounted box, the V-slot metal block, the lock pin and the guide block are arranged in the shell; the box is provided with floating ribs and building slots; the building cover comprises building arms and building bodies; the building bodies and the building slots fit; the shell is also provided with an opening cover; the opening cover and the building cover are relatively arranged; the opening cover comprises at least one top plate; and the top plate can act on the building arms of the building cover and open the building cover. The optical fiber splicing unit has simple and reliable splicing structure, short site operating time and low overall manufacture cost and greatly reduces the terminating difficulty of optical fiber splicing.
Owner:JIANGSU UNIKIT OPTICAL TECH

A bridge anti-collision guardrail and a construction method thereof

The invention discloses a bridge anti-collision guardrail and a construction method thereof, Collision barriers include columns, An upper rail and a low rail are respectively sleeved with a buff cylinder and a swirling ring on that upright column, the two ends of the upright column are fix on the upper rail through a limiting seat, the lower rail is provided with a fixing ring on the upright column, the fixing ring is in contact with the limiting seat located below, an L-shaped mounting plate is provided on the upper rail, an L-shaped mounting plate is provided with an anti-collision plate, and a cushioning guardrail plate is provided on the anti-collision plate; The construction method comprises the following steps: (a) route marking; (b) Post positioning; (c) Installation of lower railings; (d) installation of an upper railing; (e) Installation of cushion shields; (f) Installation of bumper plates; (g) Installation of remaining uprights. The anti-collision guardrail of the inventionhas the advantages of high stability, convenient installation, cushioning and anti-collision, high safety, easy operation, orderly and reasonable construction, fast and convenient construction, time and labor saving, low construction intensity and convenient maintenance in the later period. The invention has the advantages of high stability, convenient installation, cushioning and anti-collision,high safety, easy operation, orderly and reasonable construction method, fast and convenient construction, and low construction intensity.
Owner:ZHEJIANG COLLEGE OF CONSTR

High-temperature cable direct reading five-parameter logging instrument

The invention relates to a high-temperature cable direct reading five-parameter logging instrument for thermal recovery of heavy oil and dynamic tests of high-temperature wells, which comprises a shell of the logging instrument, an upper connector of the logging instrument, a heat absorber, a natural gamma circuit, a road data acquisition circuit, a magnetism positioning circuit, a pressure sensor, a heat resistance guiding section, a temperature sensor, a flow sensor, a centralizer, a ground control system, a high-temperature cable and a high-temperature cable head, wherein the electronic components, the pressure sensor and the like of the logging instrument are arranged in a high-temperature metallic insulating shell; the natural gamma circuit, the road data acquisition circuit, the magnetism positioning circuit and the pressure sensor are in circuit connection to acquire data of natural gamma, magnetism positioning, pressure, temperature and flow; the heat absorber generates heat at two ends of the natural gamma circuit, the road data acquisition circuit, the magnetism positioning circuit and the pressure sensor; and the heat resistance guiding section is used for carrying out heat insulation and pressure conduction to transfer signals generated by each component to the ground control system. The logging instrument solves the problem that logging liquid and cables can be damaged easily at high temperature in the prior art, and the logging instrument can be used for thermal recovery of heavy oil and dynamic tests of high-temperature wells.
Owner:CNPC GREATWALL DRILLING ENG

General construction method for partially ground-anchored cable-stayed suspension bridge

ActiveCN105274941AGuaranteed stabilityAvoid the problem of temporary consolidation to withstand large horizontal forcesBridge erection/assemblyHorizontal forceCable stayed
The invention discloses a general construction method for a partially ground-anchored cable-stayed suspension bridge, which belongs to the technical field of bridge construction. According to general construction method for the partially ground-anchored cable-stayed suspension bridge, a cable-stayed area girder section and a suspension area girder section of the cable-stayed suspension bridge are simultaneously erected and constructed; before the construction of the cable-stayed suspension bridge, a reasonable completed bridge state of the cable-stayed suspension bridge is determined by using a reasonable completed bridge state determining method which takes stiffness distribution into consideration; and during the construction of the cable-stayed suspension bridge, the closing of a cable-stayed area girder section girder and a suspension area girder section girder is finished by using a closing method for the cable-stayed suspension bridge. As the cable-stayed suspension bridge is erected by using the general construction method disclosed by the invention, the girder erecting speed can be effectively increased, a problem that solidified parts formed after a pylon and girder temporarily solidifies bears a greater horizontal force can be avoided, the construction period is greatly reduced and the construction strength is reduced.
Owner:CCCC SECOND HARBOR ENG

Diversion construction method of wide-riverbed dam type hydropower station

The invention relates to a diversion construction method of a wide-riverbed dam type hydropower station, aiming at providing a diversion construction method of the wide-riverbed dam type hydropower station for shortening the total time limit of hydraulic power station engineering. According to the technical scheme provided by the invention, the method comprises the following steps: a, firstly building a diversion building on one side of a riverway; b, while building the diversion building, carrying out temporary cofferdam construction on a riverbed on the other side of the riverway; c, after the temporary cofferdam construction is finished, surrounding a foundation pit by a temporary cofferdam and riversides for discharging water, and carrying out construction on a large dam; d, after the diversion building has overflowing conditions, extending the upper reach and the lower reach of the temporary cofferdam to the other side of the riverway so as to form an upper reach main cofferdam and a lower reach main cofferdam; e, discharging water in the foundation pit between the upper reach main cofferdam and the lower reach main cofferdam to form a dry construction environment; and f, carrying out full-scale construction of the large dam or a factory building between the upper reach main cofferdam and the lower reach main cofferdam. The diversion construction method is suitable for the pivotal arrangement design and construction of the arrangement in a stage diversion manner adopted by the wide-riverbed dam type hydropower station.
Owner:POWERCHINA HUADONG ENG COPORATION LTD

Novel efficient assembly-type reinforced concrete composite beam

The invention discloses a novel efficient assembly-type reinforced concrete composite beam, and belongs to the technical field of bridge construction. The novel efficient assembly-type reinforced concrete composite beam comprises a concrete bridge deck and a steel girder; the concrete bridge deck is arranged on the steel girder; a top flange plate of the steel girder is fixedly connected with a ribbed plate extending in the vertical direction of the steel girder; the bottom of the concrete bridge deck is provided with a channel extending in the vertical direction of the steel girder; the ribbed plate is arranged in the channel; two side edges of the top flange plate are fixedly connected with rubber sealing strips extending in the vertical direction of the steel girder; the bottom surface of the concrete bridge deck is in lap joint with the rubber sealing strips; the top flange plate, the rubber sealing strips, the bottom surface of the concrete bridge deck, and the channel of the concrete bridge deck defines a grouting channel; and the grouting channel is filled with a high-strength pouring sealant material. According to the invention, a series of problems brought by processing of reinforced concrete connecting pieces and cast-in-place of jointed concrete are effectively avoided, the construction quality is guaranteed, at the same time, the on-site work efficiency is improved, and the novel efficient assembly-type reinforced concrete composite beam is more environmentally friendly, and has good economic benefits.
Owner:CCCC SECOND HARBOR ENG +1

Construction method for reversely removing floor slab by using chain saw

The invention discloses a construction method for reversely removing a floor slab by using a chain saw. The construction method comprises the following steps: locating and paying off, respectively arranging longitudinal cutting lines which are parallel to each other at two sides of a to-be-removed floor slab along the length direction, arranging a plurality of horizontal cutting lines which are vertical to the longitudinal cutting lines between the two longitudinal cutting lines at intervals, and dividing the to-be-removed floor slab into a plurality of blocks; forming chain saw lacing holes in connected positions of the horizontal cutting lines and the longitudinal cutting lines on the to-be-removed floor slab, forming a hoisting hole in each block; putting the chain saw under the to-be-removed floor slab, and horizontally cutting the to-be-removed floor slab along each horizontal cutting line; after longitudinally cutting the to-be-removed floor slab from outside to inside one by one along the two longitudinal cutting lines, respectively putting down the blocks until completing the cutting and the putting down of all blocks. According to the construction method disclosed by the invention, the floor slab which has an limited upper space and is difficult to forwards remove is subjected to reverse removing construction, the problem that removing construction cannot be successfully carried out is solved, high-strength construction of large-area excavation during the reverse removing construction is removed, and the construction efficiency of removing the floor slab under a special condition is increased.
Owner:SHANGHAI NO 7 CONSTR

Interlocking dismountable anti-cracking anti-seepage permanent template

The invention provides an interlocking dismountable anti-cracking anti-seepage permanent template. A column of second panels and multiple columns of first panels are connected to form a template, the cross sections of each first panel and each second panel are of a concave shape the two sides of which are provided with walls, and each first panel and each second panel are made by adopting the following materials: ultra high toughness cementitious composite (UHTCC), a non-metal fiber woven mesh and a short fiber combined reinforced cementitious composite and a steel wire mesh and short fiber combined reinforced cementitious composite. The interlocking dismountable anti-cracking anti-seepage permanent template disclosed by the invention is used as a template in a pouring stage and is a permanent template after pouring is completed, dismounting and turnover costs are eliminated, and the problems of dismounting in template construction of a hydraulic structure, a seaport structure and a bridge, culvert and tunnel and utilization rate are solved. The interlocking dismountable anti-cracking anti-seepage permanent template disclosed by the invention has the characteristics of high stretching drawability, high crack control ability, high damage tolerance and strong energy absorption capability, anti-chlorine ion permeability and water resisting property of the interlocking dismountable anti-cracking anti-seepage permanent template disclosed by the invention are far better than those of common concrete, and the durability and service life of a concrete structure can be obviously improved.
Owner:ZHEJIANG UNIV

Treatment and construction method of super-pouring pile head

The invention discloses a treatment and construction method of a super-pouring pile head. A reinforcement cage is manufactured, and the reinforcement cage comprises a main body reinforced bar and a spiral reinforced bar, wherein the main body reinforced bar comprises a plurality of longitudinal reinforced bars which are mutually parallel to each other, are vertically distributed on the same circumference at equal intervals and are encircled to form a columnar structure; the spiral reinforced bar is spirally circled on the outer side of the columnar structure formed by encircling the pluralityof longitudinal reinforced bars; the top parts of the longitudinal reinforced bars are bent to separately form first bending reinforced bars and second bending reinforced bars; a sleeve is sleeved onthe columnar structure formed by the second bending reinforced bars; and the reinforcement cage is put in a pile hole, drilling is carried out and then concrete is poured, the reinforcement cage is annularly cut to the position of the sleeve after the concrete is condensed to a certain extent, the annularly-cut pile head is removed, and the first bending reinforcement is drawn out of the concrete.According to the treatment and construction method of the super-pouring pile head disclosed by the invention, the construction strength is reduced, the construction cost is reduced, the constructionnoise is reduced, the construction period is shortened, and the construction efficiency is improved.
Owner:CHINA METALLURGICAL CONSTR ENG GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products