Day-ahead market clearing method and system giving consideration to economy and fairness

A technology of market clearing and fairness, applied in market forecasting, information technology support systems, instruments, etc., can solve problems such as the inability to fully quantify the production costs of power generation enterprises, the inability to guarantee the fairness of backup auxiliary service plans, and the distortion of market member prices

Pending Publication Date: 2022-03-01
POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] (1) The adequacy of system backup cannot be guaranteed, and the potential security risk of insufficient backup
As the priority is to carry out bidding and clearing in the electric energy market, the remaining power generation capacity of the generator set is used to arrange backup auxiliary services, and the adequacy of the remaining power generation capacity cannot be guaranteed
If there is an overall tight power supply capacity, there may be insufficient backup, which may affect the risk of system operation;
[0007] (2) It cannot guarantee the fairness of the backup auxiliary service planning, and there is a problem affecting the "three public dispatching" of the power system
Due to the mutually exclusive characteristics between the electric energy of the generating set and the backup auxiliary service, if the remaining power generation capacity is unevenly distributed among the power generation enterprises after the completion of the electric energy market economy, it cannot be guaranteed that the backup auxiliary service will be arranged according to the principle of "three public dispatching";
[0008] (3) The production cost of power generation enterprises cannot be fully quantified, which is not conducive to the deepening reform of the subsequent market
For power generation companies, there are certain production and operation costs for both electric energy and backup auxiliary services. Since the backup auxiliary services have not yet established a market transaction mechanism under the incomplete market model, the corresponding production and operation costs are difficult to quantify, and there is a risk of distorting the price declaration of market members. At the same time, it is inconsistent with the direction of market deepening reform

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Day-ahead market clearing method and system giving consideration to economy and fairness
  • Day-ahead market clearing method and system giving consideration to economy and fairness
  • Day-ahead market clearing method and system giving consideration to economy and fairness

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0053] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be described in detail below. Apparently, the described embodiments are only some of the embodiments of this application, not all of them. Based on the embodiments in the present application, all other implementation manners obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present application.

[0054] As mentioned in the background technology, from the point of view of the current market mechanisms in the pilot regions of the electricity spot market, the electricity energy market trading mechanism has generally been established, while the market mechanism corresponding to the backup auxiliary service has yet to be established. The pilot areas often adopt the solution of market transaction clearing priority. The basic idea is to build an electric energy ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a day-ahead market clearing method and system giving consideration to economy and fairness, and belongs to the technical field of power system dispatch, and the method comprises the steps: obtaining external data needed by market clearing processing; taking electric energy market transaction requirements into consideration, taking the lowest electricity purchasing cost as an optimization target, and meanwhile, constructing constraint conditions based on the external data, the constraint conditions including a power grid operation constraint, a standby fairness constraint and a power supply operation characteristic constraint; and according to the optimization target and the constraint condition, constructing a power market transaction clearing model considering standby fairness, and solving the power market transaction clearing model to obtain a clearing result. According to the technical scheme of the invention, by considering the standby fairness factor in the construction and processing process of the electricity market transaction clearing model, the obtained scheduling decision result gives consideration to economy and fairness, and the technical scheme can powerfully provide technical support for market deepening and reform.

Description

technical field [0001] The application belongs to the technical field of electric power system dispatching, and specifically relates to a day-ahead market clearing method and system that take into account both economy and fairness. Background technique [0002] At present, my country is in the stage of deepening the reform of the electricity market, and the pilot construction of the electricity spot market is gradually accelerating, and auxiliary service markets such as peak regulation and frequency regulation have been successfully implemented in some provinces and regions. However, due to differences in the progress of market construction in different provinces and regions, the construction of the electric energy market and the auxiliary service market are not completely synchronized, which leads to the problem of market mechanism design under the incomplete market model. [0003] The so-called incomplete market model means that some of the power generation resources with ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q30/02G06Q50/06
CPCG06Q30/0206G06Q30/0283G06Q50/06Y04S10/50Y04S50/14
Inventor 段秦尉潮铸何祥针包博钱峰苏炳洪唐旭辰陈卉灿张水平付聪左剑谢祥中陈奕兴李顺涂炼杨韵雅珊徐春华
Owner POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD