The invention provides a conventional
bus resource optimal configuration method and
system considering subway
toughness improvement, and belongs to the technical field of
urban rail transit emergency connection. According to the method, actual factors such as a
rail transit and
bus network structure, conventional
bus transportation requirements, metro emergency connection requirements, limited bus
transportation capacity and bus
system extension cost are comprehensively considered, and conventional bus
service planning and metro interruption
emergency response are collaboratively optimized; according to the method, stable operation of conventional buses can be guaranteed, meanwhile, passengers detained in the metro can be evacuated to the maximum extent, the
service quality of a
rail transit and bus connection mode can be improved, and the
public transport network
toughness can also be enhanced to the great extent. Meanwhile, in the collaborative optimization process of the conventional bus service and the bus connection service, a
Pareto optimal method is introduced in view of the complexity of a dual-objective planning problem, so that efficient solving of an actual scale case is realized, and the method is closer to an actual problem.