Construction equipment and construction method for railway assembly type bridge deck ancillary facilities
A technology for ancillary facilities and construction equipment, which is applied in the field of construction equipment for railway prefabricated bridge deck ancillary facilities, can solve the problems of low construction accuracy, efficiency and safety of prefabricated bridge deck ancillary facilities, and achieve precise and efficient hoisting Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] refer to Figure 1 to Figure 4 As shown, the present embodiment provides a construction equipment for railway prefabricated bridge deck auxiliary facilities, which is installed on the bridge 6 and used for installing the prefabricated bridge deck ancillary facilities 5 on both side flanges of the bridge 6 . The construction equipment includes hoisting main structure 1, hoisting trolley 2, fine-tuning spreader 3, walking system 4 and control system, so as to realize accurate and efficient hoisting of prefabricated bridge deck auxiliary facilities 5.
[0033] Wherein, the walking system 4 is arranged under the hoisting main structure 1 and is used to drive the hoisting main structure 1 to move. Exemplarily, the walking system 4 can drive the hoisting main structure 1 to move along the extension direction of the bridge 6 , so that the construction equipment can be moved to any position for hoisting operation of the prefabricated bridge deck ancillary facilities 5 .
[003...
Embodiment 2
[0061] refer to Figure 1 to Figure 4 As shown, this embodiment provides a construction method for hoisting the railway-fabricated bridge deck ancillary facilities using the construction equipment of the railway-fabricated bridge deck ancillary facilities. All or part of the equipment is implemented to achieve accurate, efficient and safe hoisting of the prefabricated bridge deck ancillary facilities, and can realize the hoisting, installation, fine adjustment, and pouring of the prefabricated bridge deck ancillary facilities in place at one time.
[0062] The auxiliary facilities of the prefabricated bridge deck usually integrate the bottom plate of the cable trough with the bottom plate of the cable trough, the ballast wall and the side wall, which effectively reduces the force on the connecting members of the ballast wall and the side wall, and can also be used as a waterproof bridge deck. layer and protective layer. This kind of integrated prefabricated bridge deck auxili...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com