Steel plate combined type davit and mounting method thereof
An installation method and a combined technology, applied in the field of steel structure manufacturing, can solve the problems of high labor and time consumption, affecting the construction period, complex structure, etc., and achieve the effects of improving strength, ensuring installation quality, and improving support performance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] As shown in the figure, a steel plate combined chamger, including: a set of concatenation supports 1, a set of floor steel beams 2, a set of steel pipe combined support 3 and roofed arch truss 4, the graphics support 1 through the floor The steel beam 2 is connected, and the corner of the floor steel beam 2 is connected by a steel pipe combination support 3, and the roofed arch truss assembly 4 is disposed above the floor steel beam 2, and the roofed arch truss 4 passes a set of stovers. 6 Connect with the floor steel beam 2 or vertical steel pipe support.
[0032] In this embodiment, the floor steel beam is sequentially provided with an eight-layer steel beam in sequence, from the bottom to top, and the four-layer steel beam, five-layer steel beam, six-layer steel beam, seven-layer steel beam. , Eight-layer steel beam, nine-storey steel beam and ROOF steel beam.
[0033] In this example, the tape steel beam, the four-layer steel beam, the five-layer steel beam, the six-lay...
Embodiment 2
[0039] As shown in the figure, a steel plate combined chamger, including: a set of concatenation supports 1, a set of floor steel beams 2, a set of steel pipe combined support 3 and roofed arch truss 4, the graphics support 1 through the floor The steel beam 2 is connected, and the corner of the floor steel beam 2 is connected by a steel pipe combination support 3, and the roofed arch truss assembly 4 is disposed above the floor steel beam 2, and the roofed arch truss 4 passes a set of stovers. 6 Connect with the floor steel beam 2 or vertical steel pipe support.
[0040] In this embodiment, the floor steel beam is sequentially provided with an eight-layer steel beam in sequence, from the bottom to top, and the four-layer steel beam, five-layer steel beam, six-layer steel beam, seven-layer steel beam. , Eight-layer steel beam, nine-storey steel beam and ROOF steel beam.
[0041] In this example, the tape steel beam, the four-layer steel beam, the five-layer steel beam, the six-lay...
PUM