Yield statistical method for steel cord stranding equipment
A statistical method and technology for steel cords, applied in the field of steel cord production, can solve the problem of not being able to know the exact amount of wire taken up by workers, and achieve the effects of reducing operating costs, saving material costs, and improving management efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0009] The present invention will be further described in detail below in conjunction with specific examples.
[0010] The output statistics method for steel cord plying equipment includes an editable logic controller and a wire take-up meter detection device, and the wire take-up meter detection device includes a meter counting wheel and a sensor; the details are as follows:
[0011] 1) In the day shift or night shift, the programmable logic controller converts the input pulse signal sent by the sensor in real time to obtain the cumulative take-up value a0 until the full take-up value a1 of the I-shaped wheel is reached, and the full take-up value a1 is recorded into the cumulative value b1 of the total output, and record the full turn value a1 and the corresponding shift into the cumulative value c1 of the memory, and at the same time clear the accumulated value a0 to re-accumulate; The value a0 stops accumulating;
[0012] 2) Between day shift and night shift handover or b...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More