A converter and electric furnace technology, which is applied in the field of smelting process control, can solve the problems of long smelting cycle and many harmful elements in scrap steel, and achieve the effects of short smelting cycle, reducing the content of five harmful elements, and improving service life.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0027] Before batching, it is necessary to carefully check and confirm that the scrap steel entering the furnace must not contain oil, impurities, water, airtight containers, and explosives. Element. Lift the electrode to the highest position, unscrew the furnace cover, add scrap steel first, and then add molten iron. The speed of the process of adding molten iron is basically constant. %, molten iron temperature 1360 ℃.
[0028] After adding molten iron, oxygen blowing starts. Oxygen blowing is completed by the furnace door oxygen lance and the furnace wall oxygen lance. The first 2 minutes are in low oxygen mode, and the flow rate is 3200Nm. 3 / h, then turn on the medium and high oxygen mode, and the total oxygen supply flow of the oxygen lance remains 6000Nm 3 / h. The scrap steel was melted, the temperature was measured at 1550°C, and the samples were fully analyzed.
[0029] After the full melting result is reported, the carbon content is 1.13%, the P content is 0.020%...
Embodiment 2
[0035] Before batching, it is necessary to carefully check and confirm that the scrap steel entering the furnace must not contain oil, impurities, water, airtight containers, and explosives. Element. Lift the electrode to the highest position, unscrew the furnace cover, add scrap steel first, then add molten iron, and the process speed of adding molten iron is basically constant. %, molten iron temperature 1300 ℃.
[0036] After adding molten iron, oxygen blowing starts. Oxygen blowing is completed by the furnace door oxygen lance and the furnace wall oxygen lance. The first 2 minutes are in low oxygen mode, and the flow rate is 3200Nm. 3 / h, then turn on the medium and high oxygen mode, and the total oxygen supply flow of the oxygen lance is maintained at 6000m 3 / h. The scrap steel was melted, the temperature was measured at 1551°C, and the samples were fully analyzed.
[0037] After the full melting result is reported, the carbon content is 0.90%, the P content is 0.018...
Embodiment 3
[0043] Before batching, it is necessary to carefully check and confirm that the scrap steel entering the furnace must not contain oil, impurities, water, airtight containers, and explosives. Element. Lift the electrode to the highest position, unscrew the furnace cover, add scrap first, and then add molten iron. The speed of the process of adding molten iron is basically constant. %, molten iron temperature 1288 ℃.
[0044] After adding molten iron, oxygen blowing is started. Oxygen blowing is completed by the furnace door oxygen lance and the furnace wall oxygen lance. The total oxygen supply flow of the oxygen lance is maintained at 6000m. 3 / h. The scrap steel was melted, the temperature was measured at 1555°C, and the samples were fully analyzed.
[0045] After the full melting result is reported, the carbon content is 1.09%, the P content is 0.028%, and the total oxygen supply flow of the oxygen lance is maintained at 6000Nm 3 / h.
[0046]Intermittently inject lime p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com