Phosphorus removal agent and sewage phosphorus removal method
A technology for removing phosphorus and sewage, applied in water/sewage treatment, chemical instruments and methods, water/sludge/sewage treatment, etc. Easy maintenance, low phosphorus removal cost, and improved phosphorus removal stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] This pilot is located in Xiejialu Village, north of Simen Town, Yuyao City, Zhejiang Province. It treats tail water after denitrification by A / O process, and mixes iron filings and calcium carbonate particles with a mass ratio of 2.5:1 to form a phosphorus removal agent. Phosphorus agent is filled in each area of the flow channel formed by the first and second plates of the plate body, the required iron filings are 2.5t, the calcium carbonate is 1t, the treated water volume is 43t / d, and the volume of the phosphorus removal device is 8.5m. 3 Left and right, 7.8m*1.2m*0.9m, the phosphorus removal agent layer is about 60 cm high, and the distance between the first plate and the second plate is about 1.5 meters.
[0041] The sewage to be treated is 1.5-1.8m 3 The flow rate of / h is transported to the bottom of the first end of the flow channel, flows into the gap at the bottom end of the plate body, flows through the phosphorus removing agent, and then flows from the top...
Embodiment 2
[0047] This pilot is located in Fanzhou Village, Yangming Street, Yuyao City, Zhejiang Province. The pilot has been running since October 2021. The tail water after denitrification by the A / O process is treated with iron filings and calcium carbonate particles in a mass ratio of 1.8:1. Mixed to form a phosphorus removal agent, the phosphorus removal agent is filled in each area of the flow channel formed by the first and second plates of the plate body. Device tank volume 22m 3 , width 4m*length 5m*height 1.1m, the phosphorus removal agent layer is about 60 cm high, and the distance between the first plate and the second plate is about 1.5 meters.
[0048] The sewage to be treated is 4.6-5m 3 The flow rate of / h is transported to the bottom of the first end of the flow channel, flows into the gap at the bottom end of the plate body and flows through the phosphorus removing agent, and then flows over the top of the second plate body. See Table 2 for some data on the phospho...
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


