A bridge abutment and steel casing technology, applied in the direction of infrastructure engineering, bridges, bridge construction, etc., can solve problems affecting the connection between steel casing and pile foundation, steel casing offset, etc., to achieve enhanced connection stability, The effect of convenient connection work
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] Attached to the following Figure 1-5 This application will be described in further detail.
[0037] The embodiment of the present application discloses a prefabricated abutment structure, refer to figure 1 and 2 , including the abutment body 1, the abutment body 1 is composed of a steel cage 11, a steel sleeve 12 and poured concrete; the steel sleeve 12 is in the middle of the steel cage 11, and the steel cage 11 and the steel sleeve 12 are fixed by stirrups Connection: After the steel sleeve and the steel cage 11 are connected, the formwork 2 is built, and concrete is poured into the steel cage 11 to form a prefabricated abutment after solidification.
[0038] refer to Figure 1-3 , wherein, in order to ensure that the steel casing 12 is offset during the concrete pouring process, a positioning column 3 is vertically fixed in the middle of the formwork 2 at the bottom, and the positioning column 3 is smaller than the inner diameter of the steel casing 12; in this e...