External storage method maintenance device of on sea large volume concrete and its method
A large-volume concrete and concrete technology, applied in the direction of ceramic molding machines, manufacturing tools, etc., can solve the problems of complex construction process, difficult operation, heavy workload, etc., and achieve the goal of speeding up the construction progress, improving efficiency, and reducing workload Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Adopting the device of Fig. 1 and Fig. 2 carries out the method for concrete cap 3 maintenance and comprises the steps:
[0027] After the concrete cap is poured and tamped, cover the concrete top surface of the cap with plastic film and sack in sequence, and turn on the heating device installed in the outer large airtight cabin 1 or / and inner cavity 2, and control the temperature difference between the inside and outside of the concrete cap at 25°C , the curing time is 14 days.
[0028] The temperature calculation results and actual measurement results of the measuring points are shown in Figure 3. In the figure, curve 1 is the measured result, and curve 2 is the calculated result.
[0029] The test results show that the method of the invention not only has a simple structure and is convenient to operate, but also the quality of the concrete cap can completely reach the specified index.
PUM
| Property | Measurement | Unit |
|---|---|---|
| width | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 