Gas filling substation additional high-pressure gas-filling method and device

A gas filling sub-station and gas filling device technology, applied in container filling methods, equipment loaded into pressure vessels, gas/liquid distribution and storage, etc. Problems such as low air intake rate of the bottle group and large fluctuations in air filling pressure have been achieved, which is conducive to popularization and application, high air intake rate, and high luck efficiency

CN100478606CInactive Publication Date: 2009-04-15马磊
4 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Publication Date
2009-04-15
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
Patent Text Reader

Abstract

The gas adding sub station with the gas adding method in high pressure and the device is made by the gas supplying system of three lines sequence in gas adding station, the high pressure gas supping system connected with the multi lines gas in auto sequencing gas adder. In keeping the normal gas adding pressure, the additional high pressure gas supplying system is opened; the gas adder adds the gas to out according to the low, middle, high pressure and additional high pressure sequence, so the gas supplying time of the low pressure gas bottle is prolonged. The invention has the high gas getting effect and gas transforming effect; it also can save the energy, has low cost, stable gas adding pressure to increase the set distance between the gas adding sub station and mother station, to enlarge the radiating field to benefit for using the gas automotive.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a gas filling method and device for a compressed natural gas gas filling substation, in particular to an additional high-pressure gas filling method and device. Background technique

[0002] At present, the gas filling method and device of the existing compressed natural gas filling sub-stations at home and abroad are three-line sequential supply with three sets of low, medium and high-pressure gas cylinder groups and corresponding gas supply pipelines connected with the three-line intake type gas filling machine. gas system. According to the sequence of low, medium and high pressure, the method of getting gas from the gas cylinder group and filling gas vehicles uses a three-line filling machine, which is usually called a three-line sequential filling method. In reality, when gas vehicles are refueled, the amount of natural gas remaining in the vehicle cylinders varies, and the pressure of the remaining gas is different, so no...

Examples

Embodiment Construction

[0010] In the above drawings, an additional high-pressure gas supply system 2 is added to the three-line sequential gas supply system 1 of the gas filling sub-station, connected to the multi-line air intake type automatic sorting gas filling machine 3, which is turned on when it is necessary to maintain the normal gas filling pressure and gas filling Additional high-pressure air supply system, multi-line air intake type automatic sorting air dispenser 3 takes air in the order of low, medium, high pressure, and additional high pressure to add air to the outside.