Concrete face board rock-fill dam bed course area moving boundary wall filling construction technique
A technology for the concrete face and cushion area, which is applied in the construction technology field of moving side walls in the cushion area of concrete face rockfill dams, can solve the problems of many cracks in the concrete face, achieve the improvement of the filling speed of the dam body, and high application value , The effect of reducing the amount of processing work
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] 1. Mobile side wall design
[0015] The mobile side walls are designed as reinforced concrete prefabricated walls with a rectangular section. The overall strength of the side wall must meet the requirements of installation and stability under vibration and rolling conditions. The height and width of the side wall are related to the thickness of the layered rolling layer of the cushion material, the rolling parameters and the upstream slope of the cushion area. In actual construction, the height and width of the wall are designed according to the specific construction parameters. The length of the side wall is determined according to the rolling experiment. When rolling, the wall is stable, and the horizontal displacement is not more than 2cm, so as to ensure the compaction of the cushion material. Two lifting lugs are arranged symmetrically on the top surface of the side wall to facilitate lifting and moving. For example: the cushion material thickness is 43cm, the co...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 