Land parcel transferring device for retaining soil construction and method for using the same to transfer land parcel
A technology of plots and soils, which is applied in the directions of packaging, transportation and packaging, bottle/can parts, etc., can solve the problems of unfavorable experiment development, increase of experiment cost, etc., and achieve uniform force and reduce soil resistance Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] The first step adopts a square box body 1 with a side length of 1.5 meters, and the wall thickness of the box body 1 is 2 centimeters, and the plot to be moved is divided into several small plots 21 with a side length of 1.48 meters and a width of 12 centimeters. The small plot gap 22, as shown in Figure 4, the small plot gap is dug into depth and is the ditch 23 of 1.5 meters, and the soil dug out is used as spare soil for subsequent use;
[0037] In the second step, the box bottom 2 on the box body 1 is drawn out, the box body 1 is placed around the small plot 21, and the space around the inner wall of the box body 1 and the small plot 21 is filled with spare soil, Insert the box bottom 1 into the box bottom advance and retreat track 3, activate the box bottom push-pull mechanism 4, and insert the box bottom 2 into the box body 1 along the box bottom advance and retreat track 3;
[0038] The third step is to dig out a placement pit with a side length of 1.58 meters at...
Embodiment 2
[0041] Adopt the box body 1 that the horizontal section is the square of side length 0.5 meter, height is 2 meters, and the wall thickness of box body 1 is 2 centimetres, and the plot that needs to migrate is divided into several small plots 21 and 0.48 meter in side length. Width is the small plot gap 22 of 6 centimeters, and the small plot gap is dug into the ditch 23 that depth is 2 meters. Dig out a horizontal cross-section at the destination of migration and be a square with a side length of 0.58 meters and a height of 2 meters. The rest of the steps are the same as in Example 1.
Embodiment 3
[0043]Adopt the box body 1 that horizontal section is the square of side length 2 meters, height is 0.8 meter, and the wall thickness of box body 1 is 3 centimetres, makes the soil relative humidity of plot be 50%-70% by methods such as watering, will The plots that need to be moved are divided into several small plots 21 with a side length of 1.97 meters and small plot gaps 22 with a width of 10 cm, and the small plot gaps are dug into trenches 23 with a depth of 0.8 meters. When digging the small plot gap 22, counting from the ground down, the plow layer soil within 0-20 centimeters is used as the standby plow layer soil for standby use, and the root layer soil between 20 cm-60 cm is used as the standby root layer The soil is reserved, and the subsoil below 60 cm is used as a backup subsoil; the space between the inner wall of the box and the surrounding of the small plot is filled with the spare subsoil, and the horizontal section is dug out at the migration destination as a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com