Unlock instant, AI-driven research and patent intelligence for your innovation.

Manpower resource optimization configuration method of multi-assembly line workshop

A technology for optimizing the allocation of human resources, applied in the field of optimal allocation of human resources in the workshop, can solve problems such as the flexible allocation of human resources that has not been proposed

Inactive Publication Date: 2008-09-24
CHONGQING UNIV
View PDF0 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Professor Luo Ronggui from Wuhan University of Technology proposed a skill matrix to describe the flexibility of human resources in the job shop, and proved through simulation that flexible human resources can significantly improve the performance of the job shop system, but he did not propose a specific method for optimizing the flexible configuration of human resources. Program

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Manpower resource optimization configuration method of multi-assembly line workshop
  • Manpower resource optimization configuration method of multi-assembly line workshop
  • Manpower resource optimization configuration method of multi-assembly line workshop

Examples

Experimental program
Comparison scheme
Effect test

specific example

[0045] Specific example: There are three assembly lines in a workshop, and the skill matrix of the staff in the assembly line of the workshop is as follows:

[0046]

[0047] Step 2: Description of the real-time skills requirement matrix for the workstations in a multi-assembly line workshop

[0048]After the workshop operation plan is issued, the plan dispatcher will subdivide the plan into each assembly line, each assembly line process determines the station, and the skill requirements of each assembly line station employee are as follows:

[0049]

frame

install fan with

Inflow pipe

dry bottle

Check air tightness

with the General Prosecutor

Assembly

total torque

Cheng test

Water chamber buckle

Water tank leak detection

0.6

0.5

0.5

0.6

0.5

0.5

0.5

0.5

[0050] The matrix is: G=[0.6 0.5 0.5 0.6 0.5 0.5 0.5 0.5...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The human resource optimum configuration method of a multi-assembly line workshop is provided. The invention relates to the human resource optimum configuration operation method of the real-time and dynamic multi-assembly line workshop. The method is that: the real-time skill matrix of workshop production employees which can describe the operation ability of the employees on specific work stations is firstly established and is real-timely renewed according to the finished condition of skill training and practical production tasks; a work station real-time skill demand matrix is made when the production tasks are released; the difference of the two matrixes is worked out to obtain a workshop human resource configuration matrix model; the optimization solution is implemented on the model according to constraint conditions of key work stations, the inadequacy degree of suitable personnel for station work, etc., thus obtaining an optimized workshop human resource configuration proposal at any period of time. The method of the invention establishes a scientific analyzing method for the configuration and the scheduling of the human resources of the multi-assembly line workshop and is applicable to the configuration and the scheduling of the human resources in the management system of the multi-assembly line workshop.

Description

technical field [0001] The invention relates to a method for optimizing the allocation of human resources in a workshop, in particular to a method for establishing a mathematical model based on a real-time workshop employee skill matrix, and solving the problem to obtain the optimal allocation of human resources for each station in the workshop. Background technique [0002] With the intensification of competition among enterprises, people increasingly realize that human resources are the "primary resource" for enterprise development. How to effectively configure the human resources of the enterprise so as to make the enterprise run efficiently has become one of the most concerned issues of the enterprise. The fiercely competitive market economy environment puts forward higher and higher requirements for the production and management of manufacturing enterprises. Multiple varieties, small batches, short manufacturing cycles, high quality requirements, and frequent changes i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/00G06Q10/04
Inventor 尹超刘从虎尹胜马春斌
Owner CHONGQING UNIV