Ground water duplex electric testing method
A groundwater and power-connected technology, which is applied in the fields of electrical/magnetic detection for well logging records, water resource assessment, climate sustainability, etc., can solve the problem of low drilling success rate, inaccurate measurement, and influence of electrical detection. Water and other issues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0053] (1), first determine the possible water-rich section according to the geological analysis, and any measuring point O in this section is used as the sounding point:
[0054] a. If figure 1 As shown, the measuring electrodes M, N and the power supply electrodes A, B are symmetrically arranged on both sides of the measuring point O, M, N remain relatively fixed, and the power supply electrode C is located on the mid-perpendicular line of A, B, and is also located on the measuring electrode On the vertical line of M and N, the potential difference caused by C pole to M and N is O, the power supply electrodes A and B are connected to the A interface of the electric measuring instrument successively, and the measuring electrodes M and N are also connected to the electric measuring instrument M respectively. , N interface is connected, the power supply electrode C is connected to the B interface of the electrical tester, and the electrical tester is turned on for measurement....
example 1
[0068] Zhayang Village, Zhuqiao Town, Laizhou City belongs to the quartzite area. The rock is hard, the water content is low, and the static water level is 16 meters. There are more than a dozen large wells with a depth of more than 30 meters and a water output of about 20 cubic meters per day. Invention method, lay out 6 measuring points, carry out electrical measurement, as attached image 3 Shown, measuring point 1, the measured The curve is distorted at 20-25 meters, and then the measuring point is translated 5 meters in the direction of A, measuring point 2, the measured The curve distortion disappears, and the identification shows the measuring point before the translation The distortion of the line is the vertical distortion.
[0069] It is verified by actual well drilling: the rock above 26 meters is relatively broken, and the water output reaches 100 cubic meters per day and night. Continue to carry out electric survey with the inventive method, find a well dept...
example 2
[0071] as attached Figure 9 , first determine the gneiss section with good water content according to the geological analysis, take any measuring point 1 in this section as the sounding point, and conduct electrical survey, and point g at 25 meters east of this point is the distortion inflection point. Point O1 moves 5 meters to W, and the O1 curve is measured, and this inflection point is determined to be the lateral distortion inflection point. The measuring point 2 is arranged at the g point on the O1 electrical measurement curve, and the east and west curves are measured, and the 25m-30m of the E line is a distortion section. The measuring point O2 was moved eastward by a polar distance of 5 meters, and the distortion section was found to have disappeared in the O2 electrical survey curve, which proved that its nature was vertical distortion, so the well was fixed at measuring point 2.
[0072] It is verified by actual well drilling: the well depth is 50 meters, the 0-45...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 