Overall process construction method for hammering pile, special device therefor and application thereof
A construction method and a technology of a special device, which are applied in the directions of sheet pile wall, foundation structure engineering, foundation structure test, etc., can solve the problems of a construction method without internal strike and its special device, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0276] Embodiment 1, the method of carrying out the whole process of construction using the pile-pressing pile machine of the immersed tube-filled pile of 3.1 or the pile-pressing machine of the immersed-pipe cast-in-place pile of 3.2:
[0277] A site, soil layer from top to bottom: 1m thick miscellaneous fill, 5m thick soft-plastic silty clay, 2m thick fully weathered mudstone, 2m thick strongly weathered mudstone, and the following is moderately weathered mudstone.
[0278] The designed pile diameter is 800mm, the pile length is 10.5m, and the ultimate bearing capacity of a single pile is 1,500 tons, of which: the ultimate resistance of the pile tip is 1,300 tons, and the ultimate resistance of the pile side is 200 tons.
[0279] The tonnage of the pile machine is 680 tons; the internal hammer 30 weighs 8 tons; the pile pipe 35 is 15m long, 800mm in outer diameter, 20mm thick, and the lower end is partially thickened outward by 10mm.
[0280] 1. Test pile:
[0281] ①A type ...
Embodiment 2
[0297] Embodiment 2, the method for carrying out the whole process of construction with the vibrating pile machine of the immersed pipe grouting pile of 3.3:
[0298] Site conditions, pile size and bearing capacity, internal hammer 30 and pile pipe 35 are all the same as in Embodiment 1, and a 120 kW vibrating pile driver is used.
[0299] 1. Test pile:
[0300] 1. adopt the pile tip with the A-type test of embodiment 1;
[0301] ②Sinking the pile tip for Type A test: First, use a pile driver to pass the vibrating head 39 to vibrate the pile tube 35, and sink the Type A test pile tip until the vibration penetration reaches 30mm / min (at this time, the Type A test pile tip Enter the strongly weathered mudstone (about 0.1m), start to hit the A-type test pile tip with the internal hammer 30, and the pile pipe 35 follows up; Stop when the penetration is 10mm (at this time, the A-type test pile tip enters the moderately weathered mudstone for about 0.5m, and the pile length is 10....
Embodiment 3
[0312] Embodiment 3, the method for carrying out the whole process of construction using the hammer pile machine of the immersed pipe grouting pile of 3.4:
[0313] Site conditions, pile size and bearing capacity, internal hammer 30 and pile pipe 35 are all the same as in Embodiment 1, and a hammer pile driver with a diesel hammer weight of 6 tons is used.
[0314] 1. Test pile:
[0315] 1. adopt the pile tip with the A-type test of embodiment 1;
[0316] ②Sinking the pile tip for Type A test: First, use a pile driver to hammer the pile tube 35 through the hammer head 41, sink the pile tip for Type A test, until the penetration of the diesel hammer reaches 30mm / 5 hours when the falling distance of the diesel hammer is 3m. (At this time, the tip of the Type A test pile enters the strongly weathered mudstone for about 0.1m), start hitting the Type A test pile tip with the internal hammer 30, and the pile pipe 35 follows up; the falling distance of the internal hammer 30 is smal...