Positioning construction of tower mechanical equipment chassis and preparation method thereof
A technology of mechanical equipment and manufacturing methods, applied in infrastructure engineering, molds, mold separation devices, etc., can solve problems such as large amount of materials, complex structures, and cumbersome processes
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] figure 1 , 2 , 3, 4, 5, and 6 describe the connection and positioning structure form of the concrete foundation beam (1) of the tower mast type mechanical equipment and the underframe cross beam (33) of the upper mechanical equipment——the lower part of the anchor bolt (25) is vertical The structural form and matching relationship of the positioning connection structure;
[0041] According to the anchor bolts (25) including multiple sets of tower-mast mechanical equipment underframe cross beams (33), the anchor bolts (25) set the position along the axial direction of the concrete foundation beam (1) to set the section on the concrete foundation. The lower part of the vertical positioning connection structure of the anchor bolts (25) is arranged on the symmetrical two sides of the beam (1), and the part fixed with the concrete foundation beam (1) is the longitudinal length section of the concrete horizontal groove (22); Connecting piece No. 1 (47) or connecting piece No...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 