Activation time for target based high speed serving cell change
A target cell, activation time technology, applied in electrical components, wireless communication, network topology, etc., can solve problems such as call loss
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] Basically, the present solution relates to a method and arrangement that allows the HS-DSCH serving cell by having the user equipment decide the activation time, ie the connection frame number, in which it will move from the serving cell to the target cell Synchronous operation for changes (HSCC). The user equipment reports this connection frame number to the network controller in the measurement report that triggers the cell change. Then, if the HS-SCCH of the user equipment in the target cell is scheduled before the connection frame number, the user equipment is allowed to move to the target cell at the connection frame number. If not, it stays in the source cell.
[0041] image 3 A wireless communication network 300 is shown using technologies such as UTRAN. Wireless communication network 300 includes base stations serving cells, eg, base station 305 serving cell 306 and base station 307 serving cell 308 . The base stations 305 and 307 are eg radio base stations...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 