Natural gas filling method for hydraulic natural gas filling substation
A gas filling sub-station, natural gas technology, applied in gas/liquid distribution and storage, pipeline system, mechanical equipment, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] 1. After turning on the oil pump for 30 seconds, when the oil pressure rises to 20MPa, the first oil return reversing valve 7 is opened, and the high-pressure oil enters the gas cylinder trailer from the left oil inlet 10 to the second oil inlet 29. figure 2 In the middle, the first electronically controlled oil inlet valve 20 is opened to inject high-pressure oil into the first gas cylinder, and the first gas cylinder's electronically controlled gas outlet valve 12 is opened to discharge high-pressure gas from the gas outlet 30 into the buffer tank.
[0013] 2. When 95% of the gas in the first gas cylinder is exhausted, figure 1 The first oil return reversing valve 7 is closed, the first oil inlet reversing valve 6 is opened, the first gas cylinder electric control outlet valve 12 is closed, and the oil in the first gas cylinder enters the oil through the first electric control under the remaining air pressure. Valve 20, the second oil inlet 29, left oil inlet 10, the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 