Grouting method for ultrathin high polymer cutoff wall
A high polymer and anti-seepage wall technology, which is applied in water conservancy projects, sea area projects, protection devices, etc., can solve problems such as difficult to ensure the anti-seepage system, and achieve the effect of fast construction, convenient construction and cost saving
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] According to the anti-seepage design requirements of dams, three-cone pressure grooved plates and pressure grooved equipment are used to form continuous slots in dams and foundations that need anti-seepage reinforcement; two-component expansibility is injected into the slots through grouting pipes Polymer grouting material; the volume of polymer grouting material expands rapidly after chemical reaction, fills the slot and solidifies to form a polymer sheet; the polymer sheets of adjacent slots are tightly bonded together , forming a continuous, uniform and regular ultra-thin polymer cut-off wall, so as to achieve the purpose of improving the seepage performance of the dam.
[0035] The specific implementation steps are:
[0036] (1) Slot hole layout: In the dam body and foundation that need anti-seepage reinforcement, slot holes are arranged according to the design, and the slot holes are numbered.
[0037] (2) Slot hole construction: use three-cone pressure to form sl...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com