Optimization method for battery energy storage system before peak clipping and valley filling day based on quadratic programming model

A battery energy storage system, secondary planning technology, applied in electrical digital data processing, special data processing applications, instruments, etc., can solve problems such as the inability to guarantee the global optimal solution and the difficulty of selecting appropriate parameters.

Active Publication Date: 2012-08-01
SOUTHERN POWER GRID PEAK LOAD & FREQUENCY REGULATION GENERATING CO LTD +2
View PDF3 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the intelligent algorithm, it is very difficult to select the appropriate parameters, and the intelligent algorithm cannot guarantee that the global optimal solution can be obtained every time
In the dynamic programming algorithm, the remaining power of the battery is discretized, and the output of the battery can only be selected from a series of discrete values

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Optimization method for battery energy storage system before peak clipping and valley filling day based on quadratic programming model
  • Optimization method for battery energy storage system before peak clipping and valley filling day based on quadratic programming model
  • Optimization method for battery energy storage system before peak clipping and valley filling day based on quadratic programming model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0073] Example: A day-ahead optimization result of predicted load in a main substation in Shenzhen

[0074] Using two forecasted load curves of a main substation in Shenzhen as input data, the two forecasted load curves are as follows: figure 2 and Figure 4 The middle dotted line is solved by quadratic programming model and effective set algorithm.

[0075] The capacity of the energy storage system installed in the substation is 5MW·4h, and the charging and discharging power is limited to 5MW. Assume that both the initial capacity and the final value capacity are 0.

[0076] Step 1: Find the initial feasible solution b(i), i=1, 2, ..., N.

[0077] Take the initial solution as:

[0078] b(i)=0, i=1, 2, ..., N

[0079] Step 2: Perform an iterative process to find the optimal control strategy

[0080] The optimized battery charging and discharging strategy is as follows: image 3 and Figure 5 shown. The load curve after peak shaving and valley filling is as follows: ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an optimization method for a battery energy storage system before the peak clipping and valley filling day based on a quadratic programming model. In the model, the target function is convex function, the quadratic programming to be resolved is convex quadratic programming, theoretically, the global optimal solution can be obtained as long as the KKT point is calculated out, the calculating method is mature, and the initial feasible solution is conveniently and easily accessible. The residual electric quantity of the battery does not need to be discretized in the calculating process. The optimization method for the battery energy storage system before the peak clipping and valley filling day based on the quadratic programming model has the advantages of ingenious design and excellent performance, and is convenient and practical.

Description

technical field [0001] The invention is a prior-day optimization method for peak-shaving and valley-filling of a battery energy storage system based on a quadratic programming model, and belongs to the modification technology of the prior-day optimization method for peak-shaving and valley-filling of a battery energy storage system based on a quadratic programming model. Background technique [0002] A large-scale battery energy storage system (Battery Energy Storage System, BESS) can realize the function of load shaving and valley filling by discharging during peak load and charging during low load. For the power grid, peak shaving and valley filling can delay equipment capacity upgrades, improve equipment utilization, and save equipment update costs; for users, they can use the difference in peak and valley electricity prices to obtain economic benefits. Many large-scale BESSs are already in operation abroad; in China, China Southern Power Grid has launched a MW-level batt...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F17/50
Inventor 黄晓东余建国饶宏李永兴李勇琦钟朝现陆志刚王科陈柔伊董旭柱段卫国袁志昌陆超鲍冠南
Owner SOUTHERN POWER GRID PEAK LOAD & FREQUENCY REGULATION GENERATING CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More