Pile tension device
A technology of pulling piles and connecting rods, which is applied in the direction of sheet pile walls, buildings, and foundation structure engineering, etc., and can solve the problem of not being able to adjust the distance between piles without gaps, increasing the complexity and difficulty of the adjustment process of pulling piles, and the low efficiency of pulling piles, etc. problems, achieve the effect of reducing labor time and labor intensity, improving construction efficiency and convenient installation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] As shown in Figure 1, a pile pulling device includes A connecting rod 2 and B connecting rod 6, one end of A connecting rod 2 is connected with A pile and one end of B connecting rod 6 is connected with B pile, the pile pulling device It also includes a connecting cylinder 3 arranged between the A pile and the B pile, and the opposite A and B ends of the connecting cylinder 3 are respectively provided with an A-end channel and a B-end channel for the A connecting rod 2 and the B connecting rod 6 to penetrate, And in the channel at the A end and the channel at the B end, internal threads with opposite directions are provided; one end of the A connecting rod 2 is fixed on the A pile through the A connecting mechanism 1, and the other end of the A connecting rod 2 is provided with a connecting cylinder 3A The external thread corresponding to the internal thread at the end, one end of the B connecting rod 6 is fixed on the B pile through the B connecting mechanism 7 and ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 