Correcting and resetting method for pier stud of bridge
A reset method and technology for piers and columns, applied in bridges, bridge maintenance, bridge reinforcement, etc., can solve problems such as large tension, difficult reset, and difficulty in ensuring accurate reset, reducing friction, ensuring accurate reset, and leveling low thrust effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
[0028] Figure 6 It is a schematic diagram of construction and installation of the present invention (bridge longitudinal direction), as shown in the figure, the method for correcting and resetting bridge pier columns of the present invention includes the following steps:
[0029] 1) Install the vertical lifting synchronous jack, vertically lift the beam body 2 at the inclined pier column 1, and take out the support;
[0030] 2) Install a horizontal sliding system 4 between the cover beam 3 of the inclined pier column 1 and the beam body 2, and drop the beam body 2;
[0031] 3) Install the reaction force frame 5 on the cover beam 3 of the inclined pier column 1, and set the horizontal pushing synchronous jack 7 between the reaction force frame 5 and the diaphragm 6 at the end of the beam body 2, and the horizontal pushing synchronous ja...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com