Method for two-dimensional lightning leader progress model to acquire electric potential in mountainous terrain
A terrain and pilot technology, applied in the direction of measuring current/voltage, measuring electrical variables, instruments, etc., can solve problems such as being too ideal
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The technical solutions in the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the present invention.
[0029] figure 1 Shown is the flow chart of the acquisition method of the electric potential of the two-dimensional lightning leader development model of the present invention under the mountainous terrain, including the following steps:
[0030] Step 10: Extracting the actual terrain data of the transmission line through the geographic information system, the actual terrain data at least including the height of the mountaintop, the depth of the valley and the coordinates of the relevant points in the transmission line.
[0031] Step 20: Fit the actual terrain of the transmission line, use the actual terrain data obtained in step 10 to find the parameters related to the terrain in the corresponding conformal transformation function, and then use the conformal transformation function to transform the moun...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


