A component and partition wall technology, applied in excavation, construction, sheet pile walls, etc., can solve problems such as increasing agglomeration, reducing concrete coverage, etc., to achieve the effect of accelerating the assembly process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The accompanying drawings are intended to aid in the understanding of the invention, but are not intended to imply any limitation on the scope of the invention. The use of the same reference signs in different figures is intended to refer to the same or corresponding features.
[0040] will now refer to figure 1 , 2 , 3a and 3b describe in more detail existing methods of constructing partition walls. figure 1 The process of excavating, preparing and pouring the main board is shown. Areas 10, 11, 12, 13 and 14 are the five main partial pour areas in the ground 3, which show the successive steps of excavating and pouring the main panels. Area 10 shows the main board area before excavation and area 11 shows the main board area excavated with a bucket tool mounted on a crane 8, although a hydraulic milling machine 9 could also be used for this excavation step. The excavated trench remains filled with water or mud (not shown) to prevent the sides of the trench from falli...
PUM
Login to View More Abstract
Description
Claims
Application Information