Asset management method and system for electrical power system

An asset management and power system technology, applied in the field of power grid information management, can solve the problems of lack of linkage mechanism and method for materials, equipment and assets, failure to realize automatic capital transfer, lack of equipment transaction process, etc., to achieve refined management, The effect of reducing checking work and improving accuracy and convenience

Active Publication Date: 2013-03-27
STATE GRID CORP OF CHINA +2
View PDF3 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The maintenance of the equipment account is collected and maintained by the operation department, and there is a lack of equipment change process based on the project; capital transfer of infrastructure, technical transformation and other projects is carried out manually, and automatic transfer of capital through project information cannot be realized; there is a lack of information on materials, equipment and assets. linkage mechanisms and methods

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Asset management method and system for electrical power system
  • Asset management method and system for electrical power system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] Such as figure 1 As shown, an asset management method for a power system includes the following steps:

[0040] 1) First, determine the conversion rules based on the material information used by the project. The conversion rules include mapping relationships such as equipment classification, material classification, and material characteristics. The unique corresponding equipment type is specified through the conversion rules, and the BOM hierarchical model is searched according to the equipment type. If the conversion If the rule and BOM hierarchical model exist, the initial asset BOM will be automatically generated. If the conversion rule does not exist, the equipment type will be determined according to the material, and the initial asset BOM will be manually established;

[0041] The automatic creation of the initial asset BOM based on the materials used by the project includes the following steps:

[0042] ①Synchronize project-related information from PS module 2,...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an asset management method and system for an electrical power system and belongs to the field of power grid information management. The asset management device comprises a PS module for providing project information, an MM module for providing material information, an equipment transaction module for building an equipment account, a PM module for building an equipment card, an AM module for building an asset card and an asset BOM management module for building a material, equipment and device linkage relationship. By adopting a 'mateiral-equipment-asset' three-code linkage mechanism, an asset BOM is built according to the corresponding rules among the material classification, equipment type and asset directory and a BOM laddered model, and automatic corresponding rate of programs, materials and equipments is improved; a large amount of checking work of workers is reduced; and the traditional manual account maintenance is replaced by the maintenance type referring to the account information of the asset BOM through uninterrupted consumption and information improvement on the equipment and the equipment laddered information.

Description

technical field [0001] The invention relates to an asset management method and system for a power system, belonging to the field of power grid information management. Background technique [0002] Power grid enterprises are typical asset-intensive enterprises, which have the characteristics of a large number of assets and equipment, a wide range of points, and complex asset properties. The strengthening and speeding up of transformation, the complexity of the huge assets and equipment itself brings difficulties in management. In the field of power system, asset BOM refers to the relationship collection of main elements (projects, materials, assets, main equipment and important component equipment) in the equipment resource management process of power grid enterprises, and the evolution of this relationship in the actual business management process process. [0003] At present, there are the following deficiencies in the asset management process of power grid enterprises: ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
Inventor 黄海潮李建刚蒋锦霞钟一俊褚大可张弛李晓慧杨自强
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products