Method and system for oppositely arranging rheid arrangement shoal abrupt slope
A soft row and shoal technology, which is applied in water conservancy projects, artificial waterways, river regulation, etc., can solve the problems that the framing position does not meet the design requirements, the site layout requirements cannot be met, and the performance of the ship engine does not meet the layout requirements, etc., to achieve The effect of quick lay out jobs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Embodiment 1, this embodiment discloses a method for laying on steep slopes with soft shoals, including the following steps:
[0034] (1) if figure 2 As shown, the slide 3 of a high-beach laying ship 2 and a deep-water laying ship 1 are relatively docked at the laying docking point 9;
[0035] (2) Lift the soft body row 4 onto the slide board of the laying boat and roll it up. It can be rolled up by two laying boats at the same time, or one laying boat can finish rolling the soft body row first, and then discharge it to another laying boat , at this time, one laying ship is laying out, and the other laying ship is rolling up, and it is carried out synchronously;
[0036] (31) If two laying ships are laying at the same time, then:
[0037] (311) as image 3 As shown, the slide plates 3 of the two laying ships are kept horizontally docked, and the interlocking piece 5 is hoisted at the same time, and a pair of buoys are fastened on the interlocking piece at the dockin...
Embodiment 2
[0043] Embodiment 2, this embodiment discloses a method for laying on steep slopes of soft shoals, including the following steps:
[0044] (1) if figure 2 As shown, the slide 3 of a high-beach laying ship 2 and a deep-water laying ship 1 are relatively docked at the laying docking point;
[0045] (2) Lift the soft body row 4 onto the slide board of the laying boat and roll it up. It can be rolled up by two laying boats at the same time, or one laying boat can finish rolling the soft body row first, and then discharge it to another laying boat , at this time, one laying ship is laying out, and the other laying ship is rolling up, and it is carried out synchronously;
[0046] (32) If the two laying ships are not laying at the same time, then:
[0047] (321) as image 3 As shown, the two laying ship slides 3 are kept horizontally docked, and the interlocking piece 5 is hoisted at the same time, and a pair of buoys are fastened on the interlocking piece 5 at the docking point ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 