Highway gutter and its construction method
A technology for side ditches and roads, applied in the direction of side ditches/curbs, etc., can solve the problems of a large number of templates, long construction time, poor waterproof performance, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The core of the present invention is to provide a road side ditch to reduce the number of templates used, improve waterproof performance, and shorten construction time; another core of the present invention is to provide a road side ditch construction method.
[0032] In order to enable those skilled in the art to better understand the solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0033] see Figure 2-Figure 5 , figure 2 A cross-sectional schematic diagram of a road side ditch provided by an embodiment of the present invention; diagram 2-1 for figure 2 A-A schematic diagram; Figure 2-2 for figure 2 B-B direction schematic diagram; Figure 2-3 for figure 2 The C-C direction schematic diagram; image 3 A cross-sectional schematic diagram of the installation and use of the FRP web box and the FRP floor box provided by the embodiment of...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com
