Adjacent deep foundation trench and shallow foundation trench synchronous construction method
A technology of simultaneous construction and foundation pit, applied in the direction of infrastructure engineering, excavation, construction, etc., can solve the problem of difficult to guarantee construction quality, and achieve the effect of good construction quality and convenient construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0063] A method for synchronous construction adjacent to deep and shallow foundation pits, comprising the following steps:
[0064] (1) Measure the elevation of the site, verify the excavation depth of each part of the foundation pit, and remove the surface construction waste;
[0065] (2) Refer to the geotechnical engineering survey report to verify the location of underground obstacles. If there are any, the underground obstacles should be removed before construction to ensure the quality and continuity of the enclosure construction;
[0066] (3) Accurately set out the plane of the basement before construction, and check the plane distance between the outer wall and floor of the basement and the surrounding buildings and enclosure structures;
[0067] (Four)
[0068] (1) Referring to the geotechnical engineering investigation report, verify the location of the dark bank, excavate the bank soil and backfill it with plain fill, and compact it layer by layer;
[0069] (2) The c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com