Construction Technology of Integral Water Tank Preloading
A construction technology and integrated technology, applied in the erection/assembly of bridges, bridges, buildings, etc., can solve the problems of long construction period, high cost, high labor intensity, etc., and achieve short construction period, low material cost, and low labor cost. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0030] The integral pre-pressurized water tank as shown in the figure includes a water tank frame 1 built with Bailey sheets. The water tank frame 1 is surrounded by a water tank bottom plate 2, surrounding side walls 3 and a plurality of partitions 4 arranged in the water tank frame 1. A plurality of water bags 5 are also provided, and the water bags are placed in the water tank frame 1; tarpaulins 8 are laid on the bottom plate 2 and the side wall 3 of the water tank, and the partition 4 is located between two adjacent water bags 5.
[0031] Between the side walls 3 there are also upper vertical and horizontal tie rods 6 and lower layer vertical and horizontal tie rods 7 for resisting the side pressure of the water tank; The vertical and horizontal tie rods 6 are arranged at the top of the water tank; the distance between the vertic...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com