Integrated simulation system and method for refrigeration station

A technology of simulation system and freezing station, which is applied in the simulation system and simulation field of freezing stations, can solve the problems of lack of system comprehensive thinking, complex interface coordination process, and long cross-operation time, so as to improve product quality, shorten on-site construction period, The effect of improving safety and reliability

Active Publication Date: 2013-12-25
BEIJING SATELLITE MFG FACTORY
View PDF3 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] As an on-site construction project, the traditional refrigeration station has a backward construction method and scattered responsibility subjects. All parties are only responsible for their own project content and lack systematic and comprehensive thinking.
On-site construction of traditional refrigeration stations involves a series of technical and management problems, such as a large area, long hours of cross-operation between different disciplines, high coordination and management costs, large waste of materials, complex interface coordination process, and difficult maintenance and management. The impact of the on-site environment in the computer room has produced a lot of repetitive and inefficient work, wasting social resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integrated simulation system and method for refrigeration station
  • Integrated simulation system and method for refrigeration station
  • Integrated simulation system and method for refrigeration station

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] Such as figure 1 As shown, the simulation system of the present invention includes a data acquisition module, a data processing module and a simulation verification module. The data acquisition module collects equipment information and environmental information in the integrated refrigeration station, and sends them to the data processing module; the data processing module includes a refrigeration machine room unit, an equipment selection unit, an independent simulation unit and an integrated simulation unit. The equipment of the freezing station includes chillers, chilled water pumps and cooling water pumps. In the existing technology, the design of the refrigeration station is to complete the equipment selection first, and then install the equipment on site in the refrigeration room after the equipment selection is completed. Due to the structural limitations of the refrigeration room, the layout is scattered, and the original design needs to be revised repeatedly, w...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Disclosed is an integrated simulation system and method for a refrigeration station. The integrated simulation system comprises a data collecting module, a data processing module and a simulation checking module. The data collecting module collects equipment information and environment information of the integrated refrigeration station and the data processing module comprises a refrigerating machine room unit, an equipment selecting unit, an independent simulation unit and an integrated simulation unit. The independent simulation unit performs integrated three-dimensional simulation modeling on equipment, mounting platforms, pipelines and pipeline supports in the refrigeration station, the data processing module checks positions of the overall three-dimensional model, and the simulation checking module performs final mechanic checking. When mechanic checking is passed, simulation of the integrated refrigeration station is completed. By the system and the method, engineering construction requiring site operation is changed into a mechatronic system product which is prefabricated in factories and assembled modularly on site, onsite construction cycle is shortened greatly, and product quality of the integrated refrigeration station is improved greatly.

Description

technical field [0001] The invention relates to a simulation system and a simulation method, in particular to a simulation system and a simulation method for a freezing station. Background technique [0002] As an on-site construction project, the traditional refrigeration station has a backward construction method and scattered responsibility subjects. All parties are only responsible for their own project content and lack systematic and comprehensive thinking. On-site construction of traditional refrigeration stations involves a series of technical and management problems, such as a large area, long hours of cross-operation between different disciplines, high coordination and management costs, large waste of materials, complex interface coordination process, and difficult maintenance and management. The influence of the field environment of the computer room has produced a lot of repetitive and inefficient work, wasting social resources. Contents of the invention [000...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F17/50
Inventor 宗文波马剑云杨丹杨辉杨谦宋佳晖