Construction method for translation and replacement of blast furnace top air-tight box device
A construction method and blast furnace technology, applied in blast furnaces, blast furnace details, blast furnace parts, etc., can solve problems such as the dismantling and installation of the crown crane, and solve the problem that the crown crane cannot be used for hoisting, speed up the construction progress, and reduce investment Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0020] 1. Production of translation girder
[0021] The translating girder 1 is welded by I-beam and track, that is, the upper flange plate of I-beam is welded to the track. The translating girder 1 is the main facility during the translation process of the airtight box. A form of small friction causes it to translate over it.
[0022] 2. Remove the accessory parts of the airtight box
[0023] The parts of the airtight box to be removed include the upper pup joint, flange connection bolts, connecting various pipelines, and the distribution chute. The joints of each part should be well protected during removal.
[0024] 3. Set up translation facilities
[0025] The most important part of the translation of the airtight box is to set up translation facilities. It is the technical core of the overall translation, the key to realize the translation of the airtight box, and the center of the entire construction process. The installation of the translation girder is carried out at...