Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Early-warning and prediction method for sedimentation nearby tunnel construction working face

A prediction method and tunnel construction technology, which is applied in the field of early warning and prediction of surface subsidence, and the field of early warning and prediction of settlement near the tunnel construction work surface, can solve problems such as unreasonable construction parameters, excessive consumption of support materials, and broken pipelines, so as to avoid personnel and The effect of economic loss

Active Publication Date: 2014-03-12
GUANGZHOU METRO GRP CO LTD +1
View PDF5 Cites 21 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Different geological structures require different support structures, resulting in complex support and high consumption of support materials
At the same time, during the construction process, due to unreasonable construction parameters, ground subsidence, building (structure) damage, pipeline breakage, etc. are caused, resulting in huge human and economic losses.
However, in the existing technology, there is no scientific and reasonable method for early warning and prediction of surface subsidence during tunnel excavation, which can realize timely early warning and prediction of subway tunnel safety.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Early-warning and prediction method for sedimentation nearby tunnel construction working face
  • Early-warning and prediction method for sedimentation nearby tunnel construction working face
  • Early-warning and prediction method for sedimentation nearby tunnel construction working face

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] The present invention will be described in detail below in conjunction with the accompanying drawings and specific implementation methods. The schematic implementation and description of the present invention are used to explain the present invention, but are not intended to limit the present invention.

[0020] like figure 1 As shown, the settlement early warning and prediction method near the tunnel construction face of the present invention comprises the following steps:

[0021] Step a: collect construction parameters, stratum parameters and surface settlement parameters in real time, and establish a database based on data input, retrieval and query of construction parameters-stratum parameters-surface settlement parameters.

[0022] Step b: Obtain a number of surface subsidence parameters corresponding to stratum parameters and construction parameters that are the same as or similar to the construction parameters and stratum parameters collected in real time accord...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an early-warning and prediction method for sedimentation nearby a tunnel construction working face. The early-warning and prediction method includes the following steps: collecting construction parameters, stratum parameters and ground surface sedimentation parameters in real time, setting up a database based on the construction parameters, the stratum parameters and the ground surface sedimentation parameters, obtaining the multiple ground surface sedimentation parameters corresponding to the same or similar stratum parameters and the same or similar construction parameters, carrying out fitting and regression analysis on the ground surface sedimentation parameters with the polynomial-included least square fitting algorithm and the algebra interpolation method, obtaining a longitudinal ground surface sedimentation prediction curve, according to the longitudinal ground surface sedimentation prediction curve, in cooperation with input soil body parameters and input tunnel radius, obtaining a transverse ground surface sedimentation prediction curve with the PECK formula, judging whether values represented by the longitudinal ground surface sedimentation prediction curve and the transverse ground surface sedimentation prediction curve exceed early warning values or not, and if the values represented by the longitudinal ground surface sedimentation prediction curve and the transverse ground surface sedimentation prediction curve exceed the early warning values, giving an alarm. According to the early-warning and prediction method, timely early warning and timely processing on the ground surface sedimentation caused by metro tunnel construction can be achieved, and therefore personnel and economic losses caused by the unreasonable construction process can be avoided.

Description

technical field [0001] The invention relates to a method for early warning and prediction of surface subsidence, which belongs to the technical field of rail transit safety construction, in particular to a method for early warning and prediction of subsidence near a tunnel construction work surface. Background technique [0002] At present, the construction methods used in the construction of urban rail transit projects mainly include open-cut method, mine method and shield method. Among them, the shield method is to use the shield machine equipment to cut and excavate the soil through the key equipment such as cutter head, jack and screw machine to realize the construction method of excavation; the mining method refers to the operation method of excavating underground tunnels. The basic principle of the construction method of constructing the tunnel is that after the tunnel is excavated, it is affected by blasting, causing the rock mass to rupture and form a slack state, wh...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21F17/18
Inventor 丁建隆吕培印袁敏正廖翌棋林志元李鹏飞杨玲芝王玉博李军方恩权
Owner GUANGZHOU METRO GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products