Construction method for arranging and machining inner separating plate of formed rectangular steel member
A construction method, the technology of rectangular steel, applied in the direction of building structure, construction, etc., can solve the problems such as the inability to add internal partitions, and achieve the effects of shortening the construction period, low project cost, and saving resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0037] A construction method for setting and processing internal partitions of formed rectangular steel members. The formed rectangular steel column member 1 includes a formed steel column member or a formed steel beam member, and an internal partition 2 is set inside the formed rectangular steel member 1. status, such as figure 1 As shown, the construction process of the construction method for setting the inner partition 2 includes 1) measuring the marking line, 2) marking the positioning line of the cutting cover plate, 3) cutting the cover plate, 4) the internal partition part and the formed rectangular steel member 1 The three inner walls inside are spot welded and welded. 5) The cut cover plate is put back to the original position of the cut hole of the formed rectangular steel member 1 and welded and fixed. The operation steps of each process are as follows:
[0038] 1) Measure the scribe line
[0039] The inner partition 2 is set in the formed rectangular steel member...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Length | aaaaa | aaaaa |
| Width | aaaaa | aaaaa |
| Wall thickness | aaaaa | aaaaa |
Abstract