Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Dynamic scheduling method for multi-runway flight getting in and out

A technology of dynamic scheduling, entry and departure, applied in the field of civil aviation, can solve problems affecting runway scheduling, adjustment, and many flights taking off and landing.

Active Publication Date: 2014-05-07
NANJING UNIV OF AERONAUTICS & ASTRONAUTICS
View PDF5 Cites 36 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Because large airports often have multiple runways, the complexity of flight arrival and departure scheduling is increased. The complexity is reflected in the fact that there are many take-offs and landings of flights. Once a flight delay occurs or a flight delay at other airports will cause a very large The impact of flight delays is large; second, flight delays, especially during flight-intensive time periods, will lead to the adjustment of multiple flight scheduling plans; third, the scheduling problems of multiple runways at hub airports are mutually Fourth, certain constraints jointly affect the scheduling of incoming and outgoing flights on the runway; fifth, flight delay is one of the key indicators for assessing airlines, and the scheduling of flight arrivals and departures on the runway is directly related to the interests of airlines

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Dynamic scheduling method for multi-runway flight getting in and out
  • Dynamic scheduling method for multi-runway flight getting in and out
  • Dynamic scheduling method for multi-runway flight getting in and out

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] Please refer to figure 1 As shown, in view of the demand of large airports to increase runway utilization and reduce the cost of flight delays, as well as the multi-runway status of large hub airports, in the case of flight delays, the dynamic scheduling of flight arrivals and departures, the implementation process can be divided into for the following 6 steps:

[0035] Step 1. Analyze flight delay costs, and propose an objective function for dynamic scheduling of arrival and departure of multi-runway flights that minimizes the cost of all flight delays.

[0036] (1) Analyze the impact of aircraft type factors on flight delay costs, and introduce the aircraft type priority coefficient

[0037] The average delay cost per second of heavy, large and small aircraft is very different. According to relevant calculations, the average delay cost per second of heavy, large and small aircraft is 1.1 yuan, 0.55 yuan and 0.32 yuan respectively; In the objective function design of d...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a dynamic scheduling method for multi-runway flight getting in and out. The method comprises the following steps that flight delay cost is analyzed, and a flight delay cost minimization objective function for multi-runway flight getting in and out scheduling is provided; theoretic delay time is calculated, and flight delay time of different aircraft types is converted into delay time of unit delay cost; fairness of multi-runway scheduling is analyzed, and the objective function considering the fair factor is built; ordinary constrain conditions of multi-runway flight dynamic scheduling are provided; the multi-runway flight scheduling constrain conditions considering flight delay are designed; the dynamic scheduling problem of multi-runway flight getting in and out is solved by adopting the genetic algorithm, dynamic scheduling of multi-runway flight getting in and out is achieved, and the purposes of improving the runway using rate and reducing the flight delay cost are achieved. According to the method, influence on multi-runway scheduling caused by flight delay is sufficiently considered, and the purposes of improving the runway using rate and reducing the flight delay cost are achieved.

Description

Technical field: [0001] The invention relates to a dynamic scheduling method for the arrival and departure of multi-runway flights, belonging to the technical field of civil aviation. Background technique: [0002] The airport is one of the bottlenecks of civil aviation transportation, and the runway is the key resource of airport surface transportation. Reasonable scheduling of flight arrivals and departures can ensure flight safety, reduce delay losses and improve airline reputation. Therefore, scheduling the arrival and departure of multi-runway flights at large airports is one of the important contents of air transport management. [0003] The current scheduling of arrival and departure of multi-runway flights is mainly to establish a single-objective scheduling model with the goal of minimizing aircraft delay time or delay loss. dynamic scheduling and planning. Because large airports often have multiple runways, the complexity of flight arrival and departure scheduli...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06N3/12
Inventor 姜雨徐兆龙罗宇骁徐新星
Owner NANJING UNIV OF AERONAUTICS & ASTRONAUTICS
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products