Unlock instant, AI-driven research and patent intelligence for your innovation.

Transition Adjustment Method of Coordinated Control of Traffic Arterial Signals

A traffic trunk line and coordinated control technology, which is applied in the transitional adjustment of traffic trunk line signal coordination control and the field of traffic signal control, can solve problems such as not considering the actual needs and limitations of road traffic signal machines, and achieve wide application range, easy implementation, and flexibility sex high effect

Active Publication Date: 2016-06-29
TRAFFIC MANAGEMENT RES INST OF THE MIN OF PUBLIC SECURITY
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the above-mentioned transitional adjustment method is less involved in how to realize the rapid adjustment of the coordination scheme of the traffic signal control equipment, and does not consider the actual needs of the road traffic signal machine in the transitional adjustment process, so it will be greatly restricted in practical applications

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Transition Adjustment Method of Coordinated Control of Traffic Arterial Signals
  • Transition Adjustment Method of Coordinated Control of Traffic Arterial Signals
  • Transition Adjustment Method of Coordinated Control of Traffic Arterial Signals

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The present invention will be further described below in conjunction with specific drawings and embodiments.

[0032] In order to realize the smooth transition of the coordinated control scheme, the transition adjustment method of the present invention includes the following steps:

[0033] a. The coordinated control area of ​​the traffic arterial line contains the numbered Ι 1 、Ι 2 、...Ι i ,...,Ι n The n intersections of , the common signal period when coordinating each intersection in the coordination control area is C A ;Choose the zero point as the reference point, and carry out the phase difference offset to each intersection in the coordination control area, S i for intersection I i At the scheme switching time T t The absolute number of seconds from zero, then at the scheme switching time T t , at the end of the period of the current control scheme, intersection I i The signal cycle of the corresponding target coordination scheme has been executed time C ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a traffic signal control method, in particular to a transitional adjustment method for traffic arterial signal coordinated control, belonging to the technical field of traffic arterial coordinated control. According to the technical solution provided by the present invention, the transitional adjustment method for the coordinated control of traffic arterial signals includes: taking zero o'clock of the current day as the starting point of the coordinated control scheme, according to the remaining period of the road traffic signal from the next coordination period when the scheme is switched According to the cycle adjustment strategy in the transition adjustment of coordinated control, the distribution method of the green light duration when the cycle is shortened and extended is given respectively, and the green light duration of each phase is obtained. Finally, each phase is formed. Coordinate and control transition programs. The invention is easy to operate, can realize the smooth transition of the coordinated control scheme, has wide adaptability, and is safe and reliable.

Description

technical field [0001] The invention relates to a traffic signal control method, in particular to a transitional adjustment method for traffic arterial signal coordinated control, belonging to the technical field of traffic arterial coordinated control. Background technique [0002] In the coordinated control of urban traffic signal trunk lines, when the intersection signal is adjusted from the current coordinated control scheme to the target coordinated scheme, it is hoped that the control scheme can be adjusted quickly with the change of traffic conditions, but the change should not be too drastic, so as to To prevent sudden fluctuations in road traffic caused by sudden changes in timing parameters, resulting in blockage and impact on traffic flow, reduces the expected benefits of the implementation of the new scheme. Therefore, it is urgent to establish and realize a fast, stable and practical transition method of traffic signal coordination control scheme, so as to ensur...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G08G1/07
Inventor 树爱兵张雷元何广进赵永进徐棱吴晓峰
Owner TRAFFIC MANAGEMENT RES INST OF THE MIN OF PUBLIC SECURITY