Construction method for overall iron tower displacement
A construction method and technology for iron towers, which are applied in building maintenance, construction, building construction, etc., can solve the problems of slow construction progress, large amount of tools and equipment, and many links of dismantling and assembling iron towers.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] As shown in the figure, the overall iron tower displacement construction method involved in the present invention comprises the following steps:
[0020] 1) The staff ascend the tower to remove the guide and ground wire accessories on the tower, put the guide and ground wire into the wire pulley, after the pulley door is sealed, use 4 balanced stay wires, and fix one end of the balance stay wire to the lower plane of the cross arm , the other end is connected to the ground anchors on both sides of the new tower position and the original tower position on the ground. The staff on the tower conduct a comprehensive inspection, and deal with any problems in time. After there is no problem, the staff on the tower evacuate to the ground. Set up a holding pole on both sides between the front of the new tower position and the original tower position, and drop the wires on both sides of the tower on the top of the holding rod to support the wires;
[0021] 2) The ground between ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com